My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
97-023
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1997
>
97-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:20 PM
Creation date
6/26/2003 10:47:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
97-23
Date
5/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 2 <br /> <br />PROGRAM MANAGEMENT <br /> <br />The Mitigation Monitoring Program (MMP) for the development of the Home Place Shopping <br />Cemer project will be in place throughout all phases of the project, including design, construction <br />and operation. The enforcement of the MMP will be the responsibility of the City of Santa Ana. <br />The primary City personnel responsible for verifying compliance with the mitigation measures are <br />listed below, with the Environmental Coordinator of the Planning Division, Planning and Building <br />Agency having the primary roles of coordinating the compliance verifications of all other parties. <br />These parties, or designated assignees, are responsible for ensuring that the mitigation measures <br />are implemented by the project applicam and are vested with the authority to act accordingly. <br /> <br />Plannin_~ and BuildinE A~ency <br /> <br />Planning Division <br /> <br />Building Division <br /> <br />Planning Manager <br />Environmental Coordinator <br />Case Planner <br />Landscape Associate <br /> <br />Inspection Services Manager <br />Senior Plan Check Engineer <br /> <br />Development Engineering Division <br /> <br />Water Resources Division <br /> <br />Engineering Services Manager <br />Enterprise Coordinator <br /> <br />Water Resources Manager <br /> <br />Fire Prevention Division <br /> <br />Fire Marshall <br /> <br />Community Services Division <br /> <br />Police Administration <br /> <br />Deputy Cbief <br />Crime Prevention Sergeant <br /> <br />Community Services Specialists <br /> <br />The Environmental Coordinator or designated assignee will, primarily through plan checks and <br />field inspections, supervise the design and construction of the project, and will be responsible for <br />the overall management of the MMP. The above-noted designated "monitors" shall oversee <br />elements of the MMP and review compliance through the use of compliance verification forms to <br />be developed by the City and supported by the Environmental Coordinator. A sample of a <br />compliance verification tbrm is provided in Appendix A. Designated monitors shall ensure <br /> <br />143 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.