Laserfiche WebLink
144 <br /> <br />compliance verification forms are filled out correctly and proper action is being taken on each <br />measure. Designated monitors are also responsible for filing and updating the verification during <br />all phases of the project. During the design and construction phases, the designated monitors <br />from the Planning and Building Agency will determine the need for a measure to be modified and <br />ensure the use of a mitigation specialist, such as a consulting engineer, if technical expertise <br />beyond the monitor's abilities is required. Ir'it is found that an adopted mitigation measure is not <br />being properly implemented, the designated monitors shall require corrective actions to ensure <br />adequate implementation. <br /> <br />4 <br /> <br /> <br />