My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
97-023
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1997
>
97-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:20 PM
Creation date
6/26/2003 10:47:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
97-23
Date
5/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
146 <br /> <br />Timin_~ of [m.olement ationFVerifi catinn <br /> <br />Prior to issuance ora building permit <br />Building plan check <br /> <br />Building Division: Senior Plan Check <br />Engineer <br /> <br />New gas lines shall be equipped with automatic shut-offvalves that will be <br /> <br />activated in the event of a major earthquake. <br />Timin~ of Implementation/Verification <br /> <br />Prior to issuance of a certificate of <br />occupancy. <br /> <br />Building plan check <br /> <br />Building Division: Senior Plan Check <br />Engineer <br /> <br />All potentially dangerous non-structural features of the project as determined by the <br />Planning Division shall be tied into structural elements of the building. Heavy equipment <br />and other potentially hazardous objects shall be secured to floors and/or walls. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to issuance of building permits. <br /> <br />Building plan check and field inspection <br /> <br />Building Division: Senior Plan Check <br />Engineer; Planning Division: Case <br />Planner <br /> <br />Prior to the issuance of a building permit, the applicant shall construct a 48-inch main line <br />storm drain connecting to Orange County Flood Control District (OCFCD) Southwest <br />Tustin Channel (Facility Fl 1) consistent with the City of Santa Ana's Master Plan of <br />Drainage. The applicant shall connect to the new 48-inch line with a new 24-inch storm <br />drain lateral from the project site. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to completion of Seventeenth <br />Street improvements. <br /> <br />Grading plan check and final inspection for <br />Seventeenth Street. <br /> <br />Project applicant; Public Works Agency: <br />Engineering Services Manager <br /> <br />Prior to issuance of Certificate of Occupancy for Orchard Supply Hardware, those pads <br />and portions of the site not being developed shall be provided interim landscaping as <br />follows to the satisfaction of the City to minimize dust generation: Retail Buildings 2 and <br /> <br />6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.