Laserfiche WebLink
SECTION 3 <br /> <br />145 <br /> <br />MITIGATION MONITORING PROGRAM <br /> <br />The project applicant shall obtain a general plan amendment and zone change for the <br />northerly 65 feet of the property in order to allow development of the project as proposed. <br /> <br />Timing of Implementation/Verification Prior to issuance of a grading permit <br /> <br />Resolution approved by City Council <br /> <br />Responsible Parties <br /> <br />Planning Division: Case Planner <br /> <br />A detailed geotechnical evaluation, including subsurface exploration and laboratory <br />testing shall be approved by the City of Santa Ana Planning and Building Agency prior to <br />issuance of a grading permit or construction permit, whichever is obtained first. The City <br />shall require, as appropriate, those measures identified in the geotechnical report for <br />incorporation into the project. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to issuance of a grading pen'nit or <br />construction permit, whichever is first. <br /> <br />Grading/Building plan check <br /> <br />Responsible Parties <br /> <br />Building Division: Senior Plan Check <br />Engineer <br /> <br />Prior to project construction, existing on-site improvements shall be evaluated and <br />recommendations developed by the project geotechnical consultant to mitigate against <br />identified adverse geotechnical impacts. <br /> <br />Timing of Impl¢ipentation/Verification <br /> <br />Prior to issuance of a grading permit <br />or building permits, whichever is <br />first. <br /> <br />Grading/Building plan check <br /> <br />Responsible Parties <br /> <br />Building Division: Senior Plan Check <br />Engineer <br /> <br />All buildings shall be designed and constructed in compliance with the Seismic Safety <br />Element of the City's General Plan and all applicable portions of the Uniform Building <br />Code and Building and Municipal Code of the City of Santa Ana. <br /> <br /> <br />