My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
98-089
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1998
>
98-089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:16 PM
Creation date
6/26/2003 10:47:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
98-89
Date
12/14/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
595 <br /> <br />RESOLUTION NO. 95-89 <br />PAGE 7 OF 14 <br /> <br />in Bush Street sewer shall be intercepted and <br />diverted through this new sewer to the sewer <br />main on Main Street. <br /> <br />NOTE: <br /> <br />Ail sewer mains shall have manholes <br />at intersections with other sewer <br />mains and at the end of the lines. <br /> <br />g) <br /> <br />Depict all public utility lines on this site, <br />including, but not limited to Edison, Gas, <br />Telephone, TV cables, etc., to be constructed <br />with no interference and minimum five foot <br />clearance from any City water and sewer <br />facilities. <br /> <br />h) <br /> <br />Depict all structures, light poles, trees, <br />etc., to be located five foot minimum <br />clearance form any City water and sewer <br />facilities. <br /> <br />i) <br /> <br />Depict the existing eight inch sewer main on <br />Main Street between First Street and the new <br />manhole constructed in Conditions "f" above <br />to be removed and replaced with a new 10 inch <br />sewer main and a new manhole at the <br />intersection of First and Main Streets per <br />City Standards and approved plans. The new <br />10 inch sewer main shall be constructed by <br />the developer in the same location and at the <br />same slope as the existing eight inch main. <br /> <br />J) <br /> <br />Ail of the on-site sewer and water mains <br />shall be constructed in exclusive <br />underground, non-exclusive underground, non- <br />exclusive public service easements to be <br />dedicated to the city of Santa Ana. The <br />water main easements shall be a minimum 20 <br />feet wide with paved surfaces capable of <br />supporting truck traffic. <br /> <br />k) <br /> <br />Depict the existing six inch sewer main in <br />Bush Street between First Street and the new <br />manhole in "f" above to be abandoned. <br /> <br />Phase II <br /> <br />a) <br /> <br />Depict the existing eight inch water main <br />along the abandoned portion of Second Street <br />between Bush and Spurgeon Streets on the <br />proposed site to be cut, plugged, and <br />abandoned. The existing fire hydrant located <br />on the southwest corners of Second and <br />Spurgeon Streets shall be relocated to <br />Spurgeon Street. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.