My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
98-089
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1998
>
98-089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:16 PM
Creation date
6/26/2003 10:47:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
98-89
Date
12/14/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
594 <br /> <br />RESOLUTION NO. 95-~9 <br />PAGE 6 OF 14 <br /> <br />J) <br /> <br />Show a minimum of 6.5 feet by 6.5 feet <br />property line corner cut-off at the southeast <br />corner of Bush and Third Streets; modify the <br />outline of the structure proposed for Lot 41, <br />and depict wheelchair ramp per City Standard <br />NO. 1122A~ <br /> <br />PHASE I <br /> <br />a) <br /> <br />Depict the existing outdated eight inch <br />abandoned portion of Second Street between <br />Main and Bush Streets on the proposed site to <br />be cut, plugged, and abandoned. The existing <br />fire hydrant located on the southwest corner <br />of Bush and Second Streets shall be relocated <br />to Bush Street. <br /> <br />b) <br /> <br />Depict the proposed four inch water main <br />shown along the northerly portion of the <br />proposed Phase 1 area between Main and Bush <br />Streets to be six inch in diameter. All <br />water mains constructed in the on-site <br />easements serving the development shall be <br />six inch diameter. <br /> <br />c) <br /> <br />Depict the construction of a new 6 inch water <br />main in the easement between Main Street and <br />Bush Street. This main, along with the main <br />described above in Conditions A.12.b will <br />provide water service to lots 1 through 14. <br /> <br />d) <br /> <br />Depict the existing outdated four inch water <br />main in Bush Street from Third Street to <br />First Street to be cut, plugged, and <br />abandoned. <br /> <br />e) <br /> <br />Depict the construction of a new eight inch <br />we~e~ ~me~n and appurtenances in Bush Street <br />from Third Street to First Street per City <br />Standards and approved plans. This work must <br />be accomplished with the Phase 1 development. <br /> <br />f) <br /> <br />Depict the construction of a new eight inch <br />sewer ~main per City Standards and approved <br />plans within the 25 foot wide esplanade <br />easement to accommodate the sewer needs of <br />lots 1 through 14. The sewer main shall <br />extend from the existing main in Main Street <br />to Bush Street. New manholes will be <br />constructed in Bush Street and Main Street <br />for maintenance purposes. The existing flow <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.