Laserfiche WebLink
622 <br /> <br />ENVIRONMENTAL EVALUATION <br />ER #98-O6O <br />EAST SECOND STREET LIVE/WORK ARTIST <br />201 N. MAIN STREET <br />Revised December 14, 1998 <br />PAGE 10 <br /> <br />surrounding project area. Implementation of required <br />street improvements if deemed necessary by the Public <br />Works Agency will mitigate any significant impacts. <br /> <br />Mitigation Measures/Monitoring Required: None Required <br /> <br />ee <br /> <br />Implementation of the proposed project will not have an <br />effect on or result in a need for any other governmental <br />services. No impact is anticipated. <br /> <br />Mitigation Measures/Monitoring Required: None Required <br /> <br />XII. Utilities <br /> <br />Southern California Gas Company and the Southern <br />California Edison Company supply services to the project <br />site. The proposed project is not considered to have a <br />significant impact on the existing systems or require a <br />substantial alteration for increased service capacities. <br />Potential impacts are considered insignificant. <br /> <br />Mitigation Measures/Monitoring Required: None Required <br /> <br />be <br /> <br />Pacific Bell provides communication systems to the <br />project site. Alternations to the existing <br />communications network are not anticipated to be <br />substantial. Impacts are not considered to be <br />significant. <br /> <br />Mitigation Measures/Monitoring Require4: None Required <br /> <br />Implementation of the proposed project will not result in <br />alterations to local water treatment facilities. <br /> <br />Mitigation Meast%res/Monitoring Required~ None Required <br /> <br />Implementation of the proposed project will require that <br />sewer improvements be made in the project area. <br />Implementation of the following mitigation measure would <br />lessen impacts to a level of insignificance: <br /> <br />Mitigation Measures/Monitoring Required~ <br /> <br /> <br />