Laserfiche WebLink
RESOLUTION 2001-074 <br /> <br />REVENUE <br />ACCOI[~T <br /> <br />SECTION X <br />5913 <br /> <br />5913 19) <br />5913 20) <br /> <br />5913 21) <br />5913 22) <br />5403 23) <br /> <br />DEPARTMENT/M1SCELLANEOIIS I~E OR SERVICI~ <br />PLANNING & BUILDING AGENCY <br /> <br />18) Powerapparatus: generators, motors, transformers, <br /> rectifiers, synchronous converters, capacitors, <br /> indu$~al heating, cooking or baking equipment, and <br /> other apparatus as follows: <br /> <br /> (Ratings - horsepower (HP), kilowa~s (KW), and <br /> Kilovolt amps (KVA)) <br /> <br /> Up to and including I HP, KW, KVA each <br /> Over I and not over 10 HP, KW, KVA each <br /> Over 10 and not over 50 HP, KW, KVA each <br /> Over 50 and not over 100 HP, KW, KVA each <br /> Over 100 and not over 500 HP, KW, KVA each <br /> Over 500 HP, KW, KVA each <br /> <br /> Demolition, per project <br /> <br /> Inspections outside of normal business hours (four hour <br /> minimum charge for Holidays, Saturday or Sunday <br /> inspections) <br /> <br /> Re-inspection fee assessed under applicable provisions <br /> of the Building Code <br /> <br /> Inspections for which no fee is specifically <br /> indicated (minimum charge - one (1) hour) <br /> <br /> Additional plan review required by changes, additions, or <br /> revisions to approved plans (minimum charge - one (1) hour) <br /> <br />ELECTRICAL PLAN CHECK FEES <br /> <br />Whenever elec~ical plans are required by the Building <br />Official, plan check fees shall be 65% of the electrical <br />permit fee and shall be paid at the time of submitting plans. <br /> <br />UNIT <br /> <br />PROPOSED <br />FEES <br />FY01-02 <br /> <br />Each 3.25 <br />Each 8.25 <br />Each 16.50 <br />Each 34.75 <br />Each 46.00 <br />Each 58.00 <br />Per Project 22.50 <br /> <br />Per Hour 58.00 <br /> <br />Per Hour 58.00 <br />Per Hour 58.00 <br />Per Hour 58.00 <br /> <br />Resolution No. 2001-074 <br /> Page 57 of 67 <br /> <br /> <br />