Laserfiche WebLink
RFP 01-042 <br /> <br /> 1.0 SCOPE OF WORK <br /> <br /> 1. I Prepare Plans <br /> <br /> · Electrical single-line diagram <br /> · Electrical load summary <br /> · Layout of existing equipment, noting items to be removed <br /> · Electrical plan drawing of equipment, outlets, conduit, and wiring to <br /> be installed <br /> · Lighting design improvements for apparatus rooms, kitchen, and <br /> meeting areas per Title 24 guidelines <br /> · Panelboard and switchboard schedules for above <br /> · Separate plans shall be prepared for each station <br /> · Plan package shall be suitable for plan check submittal by the Santa <br /> Ana Fire Department <br /> · Final plans shall be suitable for use as bid documents <br /> <br /> 1.2 Prepare Specifications <br /> <br /> 1.2.1 On-Drawing specifications for <br /> <br /> · Switchboard <br /> · Generator <br /> · Automatic transfer switch <br /> · Panelboards <br /> · Conduit <br /> · Wire <br /> <br /> 1.3 Cost Estimate <br /> 1.3.1 Equipment to be direct purchased by others <br /> <br /> · Budget pricing <br /> · Supplier contacts <br /> <br /> 1.3.2 Estimated labor costs for installation <br /> <br />2.0 NOT IN SCOPE OF WORK <br /> <br /> 2.1 Procurement of material and labor for construction <br /> <br /> 2.2 Plan check and permit fees <br /> <br /> <br />