My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWER ENGINEERING 1 -2001
Clerk
>
Contracts / Agreements
>
P
>
POWER ENGINEERING 1 -2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 10:00:46 AM
Creation date
6/27/2003 1:34:49 PM
Metadata
Fields
Template:
Contracts
Company Name
Power Engineering services, Inc.
Contract #
Spec 01-042
Agency
Fire
Council Approval Date
6/18/2001
Expiration Date
12/31/2003
Insurance Exp Date
11/5/2003
Destruction Year
2008
Notes
Amended by A-2003-030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP 01-042 <br /> <br />3.2.2 <br /> <br />The Consultant shall prepare preliminary construction documents <br />and submit six sets of plans to the City. The Consultant shall pay <br />for cost of reproduction of all submittals prior to approval. The <br />construction documents shall be drawn on 24" by 36" sheets. Each <br />set of drawings shall include: <br /> <br />· Site Plan <br /> <br />· Demolition plan (as required) <br /> <br />· Dimensioning plan (as required) <br /> <br />· Building plans, including floor plans, elevations, sections, and <br /> details (as required) <br /> <br />· On-Drawing specifications <br /> <br /> 3.3 Task 3 - Construction Documents <br /> <br /> 3.3.1 Prepare final plans with specifications. Corrections shall be made <br /> as required until plans are approved by appropriate City <br /> departments. <br /> <br /> 3.3.2 Prepare final detailed cost estimate <br /> <br /> 3.3.3 Provide signed originals of all approved drawings to the City <br /> together with all bid documents. Drawings must be signed by <br /> Consultant. All original bid documents shall become the property <br /> of the City. <br /> <br />4.0 PROPOSAL REQUIREMENTS <br /> <br />One (1) original and three (3) copies of the proposals are due in the office of the City of <br />Santa Ana Purchasing Division, 20 Civic Center Plaza, Fourth Floor, not later than 5:00 <br />pm, Friday, April 20, 2001. Proposals shall include the following. <br /> <br /> 4. I Organization, Credentials, and Experience <br /> 4.1. I Provide a synopsis of firm's history <br /> <br /> 4.1.2 Identify the project manager and key personnel to be assigned to <br /> the project. Describe their qualifications, education, and <br /> representative experience. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.