Mr. James G. Ross/City of~l~ta Aha September 30, 1998 <br />Proposal for Santa Aha Bridges Page two <br /> <br /> First Street Bridge- <br /> <br /> Overhead SCE parallel to First Street along the north edge of deck <br /> SCE Guide wire crossing west abutment <br /> Waterline along the south edge of bridge deck <br /> <br /> Fifth Street <br /> <br /> diameter water line in the southern most bay between "T" girders <br /> Telephone ducts in the northern most bay between "T" girders <br /> Overhead SCE parallel to Fifth Street along the north edge of deck <br /> <br /> McFadden Avenue <br /> <br /> 12" diameter water line in the southern most bay between "T" girders <br /> 84" RCP upstream of the bridge on the east channel bank <br /> <br />Traffic Control Plans -No traffic control is anticipated for Fifth Street, since all retrofit is in the <br />river. First Street and McFadden Avenue will require some type of staged construction to permit the <br />abutment retrofit to be constructed. This scope includes preparing a site specific plan sheet for each <br />bridge (First and McFadden) showing staged construction and lane closures. This scope could be <br />reduced if construction staging and traffic control can be handled with single lane closures utilizing the <br />APWA WATCH Manual. <br /> <br />Services During Construction - The cost for services during construction is developed based on a <br />very limited involvement by the consultant. It is assumed that we will attend the pre-construction <br />meeting and one subsequent meeting. The review of shop drawings will be limited to submittals that <br />would normally require the engineer of reeord's review, such as piles design, concrete mix, and ,cable <br />restrainers, etc. We will not review construction working drawings, such as rebar placement drawings, <br />falsework and formwork. Contract clarification activities will be limited to responding to RFI from <br />the construction managers via telephone. Contractor may propose alternative design, which would <br />require engineer's review and approval. The effort for performing that task is not included in the fee <br />proposal. It is our recommendation that the SDC hours and fee for this project be re-evaluated upon <br />completion of the PS&E phase. <br /> <br />WKA appreciates the opportunity to present this fee proposal to the City of Santa Aha on this <br />challenging project. We look forward to working with the City of Santa Ana on the next phase of the <br />proposal process. <br /> <br />Sincerely, <br /> <br />//~& Associates <br /> <br /> Wei Koo <br /> Project Manager <br /> <br /> Templatel/30-Sep-98 <br /> <br /> <br />