My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
W. KOO & ASSOCIATES 1 - 1998
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
W. KOO & ASSOCIATES 1 - 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:23:59 PM
Creation date
7/10/2003 9:33:41 AM
Metadata
Fields
Template:
Contracts
Company Name
W. Koo & Associates
Contract #
A-1998-158
Agency
Public Works
Council Approval Date
12/7/1998
Insurance Exp Date
9/30/2007
Destruction Year
2011
Notes
Amended by A-2003-130, A-2005-104
Document Relationships
W. Koo & Associates 1a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\W-X (INACTIVE)
W. KOO & ASSOCIATES 1B - 2005
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. James G. Ross/City of~l~ta Aha September 30, 1998 <br />Proposal for Santa Aha Bridges Page two <br /> <br /> First Street Bridge- <br /> <br /> Overhead SCE parallel to First Street along the north edge of deck <br /> SCE Guide wire crossing west abutment <br /> Waterline along the south edge of bridge deck <br /> <br /> Fifth Street <br /> <br /> diameter water line in the southern most bay between "T" girders <br /> Telephone ducts in the northern most bay between "T" girders <br /> Overhead SCE parallel to Fifth Street along the north edge of deck <br /> <br /> McFadden Avenue <br /> <br /> 12" diameter water line in the southern most bay between "T" girders <br /> 84" RCP upstream of the bridge on the east channel bank <br /> <br />Traffic Control Plans -No traffic control is anticipated for Fifth Street, since all retrofit is in the <br />river. First Street and McFadden Avenue will require some type of staged construction to permit the <br />abutment retrofit to be constructed. This scope includes preparing a site specific plan sheet for each <br />bridge (First and McFadden) showing staged construction and lane closures. This scope could be <br />reduced if construction staging and traffic control can be handled with single lane closures utilizing the <br />APWA WATCH Manual. <br /> <br />Services During Construction - The cost for services during construction is developed based on a <br />very limited involvement by the consultant. It is assumed that we will attend the pre-construction <br />meeting and one subsequent meeting. The review of shop drawings will be limited to submittals that <br />would normally require the engineer of reeord's review, such as piles design, concrete mix, and ,cable <br />restrainers, etc. We will not review construction working drawings, such as rebar placement drawings, <br />falsework and formwork. Contract clarification activities will be limited to responding to RFI from <br />the construction managers via telephone. Contractor may propose alternative design, which would <br />require engineer's review and approval. The effort for performing that task is not included in the fee <br />proposal. It is our recommendation that the SDC hours and fee for this project be re-evaluated upon <br />completion of the PS&E phase. <br /> <br />WKA appreciates the opportunity to present this fee proposal to the City of Santa Aha on this <br />challenging project. We look forward to working with the City of Santa Ana on the next phase of the <br />proposal process. <br /> <br />Sincerely, <br /> <br />//~& Associates <br /> <br /> Wei Koo <br /> Project Manager <br /> <br /> Templatel/30-Sep-98 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.