My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
W. Koo & Associates 1a
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
W-X (INACTIVE)
>
W. Koo & Associates 1a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:24:00 PM
Creation date
7/10/2003 9:37:27 AM
Metadata
Fields
Template:
Contracts
Company Name
W. Koo & Associates
Contract #
A-2003-130
Agency
Public Works
Council Approval Date
6/16/2003
Insurance Exp Date
9/30/2007
Destruction Year
2011
Notes
Amends A-1998-158 Amended by A-2005-104
Document Relationships
W. KOO & ASSOCIATES 1 - 1998
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
W. KOO & ASSOCIATES 1B - 2005
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W. KOO AND ASSOCIATES <br />MANHOUR ESTIMATES BY <br />CATEGORY <br /> <br />Page 2 <br /> <br />PROJECT Fairview Avenue Bridge over Santa Ana River CONTRACT NO. <br /> Seismic Retrofit Strategy Verification <br /> <br />:LIENT: City of Santa Aoa <br /> City of Santa Aha <br /> <br /> 'o-2 ~ ? ~ <br />TOYA-L-~H~0R:~UM 40 76~ 125 174 <br />TASK DESCRIPTION <br /> <br />Task Fairview Bridge over Santa Ana River <br /> No. <br /> <br /> 1.1 Field Review and Survey 4 <br /> 1.2 Utility Coordination <br /> 1.3 Geotechnical Design Report 4 <br /> 1.4 As-Built Model Analysis 8 <br /> 1.5 Retrofit Analysis with existing retrofit strategy <br /> 1.6 New retrofit strategy 3 <br /> 1.7 Prepare Seismic Retrofit Strategy Report 6 <br /> 1.8 Preliminary Cost Estimates 2 <br /> 1.9 Attend Strategy Meeting ~ 8 <br /> 1.10 issue Fin~! _Re~f~.~ ~el~9~ 5 12 <br /> LabOr SUbTOtal 40 76 <br /> <br /> Bridge Plans <br /> 2.2, Special Provisions <br /> 2.3i Quantity/Estimates <br /> 2.41 Initial Plan Submittal <br /> <br /> 3.1 Indepdent Checking <br /> 3.2 Final PS&E Submittal <br /> 3.3 Four Scale Plans <br /> 3.4 Final Engineers Estimates/Specification <br /> Labor SUbtotal <br /> <br /> 4.1i Pre-Bid Meeting <br /> 4.2 Respond to RFI <br /> 4.3 Shop Drawing Review <br /> 4.4 As-Buill Pans <br /> Labor SubtOtal : : - <br /> <br /> 4 <br /> <br />16 50 ! 100 <br /> 6 12 <br />8 24 30 <br />16 12 <br />2 6 8 <br />8 <br /> 15 24 <br /> 125 174 <br /> <br />40 <br />24 <br /> <br />12 <br />76 <br /> <br />491 43,784 <br /> <br />8 1,018 <br />8 761 <br />18 2,004 <br />174 14,875 <br />58 4,266 <br />89 7,411 <br />34 3,725 <br />18 1,642 <br />16 2,036 <br />68 6,045 <br />491 43,784 <br /> <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> <br />(1) See page 3 "Manhours by Plan List" for hours breakdown by Structural Plans <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.