Laserfiche WebLink
W. KOO AND ASSOCIATES- Las Vegas <br />PROFESSIONAL FEE PROPOSAL <br /> FOR <br /> <br />Page1 <br /> <br />PROJECT: Fairview Avenue Bridge over Santa Ana River <br /> Seismic Retrofit Strategy Verification <br /> <br />CONTRACT NO. <br /> <br />CLIENT: City of Santa Ana <br /> <br />OWNER: City of Santa Ana <br /> <br />Prep. by: W. Koo <br />RFP No : <br />PR0~ED SERVICe.' <br /> <br />Date: 3/26/2002 <br />Date: 3~26~2002 <br /> <br />Provide preliminary seismic retrofit evaluation of the existint Fairview Bridge over SA River (Br. No. <br />55C-0513). Seismic evaluation includes preparing a preliminary s-built model on SAP 2000, and <br />to evaluate the effectiveness of existing retrofit design. In the event additional strengthenings are <br />required, we will evaluate the strength and ductility requirement of existing foundation, piers and <br />abutments, and to study additonal retrofit alternatives <br /> <br />Provide final design of the approved seismic retrofit strategy and prepare final Plans, Specification <br />and Estimates for bidding of the retrofit design. Basic assumptions for the retrofit includes: <br />a. Abutment Retrofit ( anchor slabs and shear keys) <br />b. Foundation Retrofit <br />c. Pier Wall Strengthening <br />d. Pipe Seat Extenders and Cable Restrainers <br /> <br />Provide Environmental services for First Street Bridge, McFadden Bridge, First Street Bridge, and <br />Fairview environmental permits and biological study. <br /> <br />No. <br /> <br /> 3 <br /> 4 <br /> 5 <br /> ',1) <br />(2) <br />(3) <br /> <br />Classification <br />Project Manager <br />Senior Engineer <br />Project Engineer <br />Assistant Engineer <br />CAD <br />Labor Cost (unburdened) <br />Overhead + G&A <br />Total Labor + OH+G&A <br /> <br />(4) Fee (~ <br />(5) .... _~ota!~Burdened Labor_.~_F_.ee <br /> OTHER DIRECT COST SUMMARY(a) <br /> 01 Reproductions <br /> 02 Xerox <br /> 03 Computer <br /> 04 Travel/Transportation <br /> 05 SubConsultants <br /> 06 Special Deliveries <br />(6) TOTAL ODC (Reimb) <br /> <br />17) TOTAL PROPOSED AMOUNT $ 81,574 <br /> <br />(a) Other direct cost breakdowns are shown on Page 4. <br /> <br /> <br />