My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
W. Koo & Associates 1a
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
W-X (INACTIVE)
>
W. Koo & Associates 1a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:24:00 PM
Creation date
7/10/2003 9:37:27 AM
Metadata
Fields
Template:
Contracts
Company Name
W. Koo & Associates
Contract #
A-2003-130
Agency
Public Works
Council Approval Date
6/16/2003
Insurance Exp Date
9/30/2007
Destruction Year
2011
Notes
Amends A-1998-158 Amended by A-2005-104
Document Relationships
W. KOO & ASSOCIATES 1 - 1998
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
W. KOO & ASSOCIATES 1B - 2005
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W. KOO AND ASSOCIATES- Las Vegas <br />PROFESSIONAL FEE PROPOSAL <br /> FOR <br /> <br />Page1 <br /> <br />PROJECT: Fairview Avenue Bridge over Santa Ana River <br /> Seismic Retrofit Strategy Verification <br /> <br />CONTRACT NO. <br /> <br />CLIENT: City of Santa Ana <br /> <br />OWNER: City of Santa Ana <br /> <br />Prep. by: W. Koo <br />RFP No : <br />PR0~ED SERVICe.' <br /> <br />Date: 3/26/2002 <br />Date: 3~26~2002 <br /> <br />Provide preliminary seismic retrofit evaluation of the existint Fairview Bridge over SA River (Br. No. <br />55C-0513). Seismic evaluation includes preparing a preliminary s-built model on SAP 2000, and <br />to evaluate the effectiveness of existing retrofit design. In the event additional strengthenings are <br />required, we will evaluate the strength and ductility requirement of existing foundation, piers and <br />abutments, and to study additonal retrofit alternatives <br /> <br />Provide final design of the approved seismic retrofit strategy and prepare final Plans, Specification <br />and Estimates for bidding of the retrofit design. Basic assumptions for the retrofit includes: <br />a. Abutment Retrofit ( anchor slabs and shear keys) <br />b. Foundation Retrofit <br />c. Pier Wall Strengthening <br />d. Pipe Seat Extenders and Cable Restrainers <br /> <br />Provide Environmental services for First Street Bridge, McFadden Bridge, First Street Bridge, and <br />Fairview environmental permits and biological study. <br /> <br />No. <br /> <br /> 3 <br /> 4 <br /> 5 <br /> ',1) <br />(2) <br />(3) <br /> <br />Classification <br />Project Manager <br />Senior Engineer <br />Project Engineer <br />Assistant Engineer <br />CAD <br />Labor Cost (unburdened) <br />Overhead + G&A <br />Total Labor + OH+G&A <br /> <br />(4) Fee (~ <br />(5) .... _~ota!~Burdened Labor_.~_F_.ee <br /> OTHER DIRECT COST SUMMARY(a) <br /> 01 Reproductions <br /> 02 Xerox <br /> 03 Computer <br /> 04 Travel/Transportation <br /> 05 SubConsultants <br /> 06 Special Deliveries <br />(6) TOTAL ODC (Reimb) <br /> <br />17) TOTAL PROPOSED AMOUNT $ 81,574 <br /> <br />(a) Other direct cost breakdowns are shown on Page 4. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.