Laserfiche WebLink
W. KOO AND ASSOCIATES- Las Vegas <br /> PROFESSIONAL FEE PROPOSAL <br /> FOR <br /> <br />Page <br /> <br />PROJECT: <br /> <br />Fairview Avenue Bridge over Santa Ana River <br />Seismic Retrofit Strategy Verification <br /> <br />CONTRACT NO. <br /> <br />CLIENT: <br /> <br />City of Santa Ana <br /> <br />OWNER: City of Santa Ana <br /> <br />Prep. by: W. Koo <br />RFP No : <br />PROPOSED sERVicEi ..... <br /> <br />Date: 3/26/2002 <br />Date: 3/26/2002 <br /> <br />Provide final engineering and design of existint Fairview Bridge over SA River (Br. No. <br />55C-0513). Seismic retrofit design includes preparing a preliminary s-built model on SAP 2000, and <br />to evaluate the effectiveness of existing retrofit design. In the event additional strengthenings are <br />required, retrofit strategy would include strengthening and ductility requirement of existing foundation, <br />piers, and abutments. Elements of the retrofit design include the following list of items: <br /> <br />a. Abutment Retrofit ( anchor slabs and shear keys) <br />b. Foundation Retrofit <br />c. Pier Wall Strengthening <br />d. Pipe Seat Extenders and Cable Restrainers <br /> <br />MANHOUR SUMMARY: <br /> <br /> No. Classification <br /> 1 Project Manager <br /> 2 Senior Engineer <br /> 3 Project Engineer <br /> 4 Assistant Engineer <br /> 5 CAD <br />1) Labor Cost [unburdened) <br />(2) Overhead + G&A <br />(3) Total Labor + OH+G&A <br />(4) Fee (~ <br />(5) Total Burdened Labor + Fee <br /> <br /> OTHER DIRECT COST SUMMARY;a~ <br /> 01 Reproductions <br /> 02 Xerox <br /> 03 Computer <br /> 04 Travel/Transportation <br /> 05 SubConsultants <br /> 06 Special Deliveries <br />6) TOTAL ODC (Reimb) <br /> <br />(7) TOTAL PROPOSED AMOUNT $ 92,186 <br /> <br />(a) Other direct cost breakdowns are shown on Page 4. <br /> <br /> <br />