My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
W. Koo & Associates 1a
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
W-X (INACTIVE)
>
W. Koo & Associates 1a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:24:00 PM
Creation date
7/10/2003 9:37:27 AM
Metadata
Fields
Template:
Contracts
Company Name
W. Koo & Associates
Contract #
A-2003-130
Agency
Public Works
Council Approval Date
6/16/2003
Insurance Exp Date
9/30/2007
Destruction Year
2011
Notes
Amends A-1998-158 Amended by A-2005-104
Document Relationships
W. KOO & ASSOCIATES 1 - 1998
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
W. KOO & ASSOCIATES 1B - 2005
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W. KOO AND ASSOCIATES <br />MANHOUR ESTIMATES BY <br />CATEGORY <br /> <br />Page 2 <br /> <br />PROJECT <br />:LiENT: <br /> <br />Fairview Avenue Bridge over Santa Ana River <br />Seismic Retrofit Strategy Verification <br /> <br />City of Santa Ana <br />City of Santa Ana <br /> <br />CONTRACT NO. <br /> <br />tOTAL MANHOUR SUM <br />TASK DESCRIPTION <br /> <br />~ LU LU '~ <br /> 46 174 186 238 <br /> <br />Task Fairview Bridge over Santa Ana River <br /> No. <br /> <br /> 1.1 Field Review and Survey <br /> 1.2 Utility Coordination <br /> 1.3 Geotechnical Design Report <br /> 1.4 As-Built Model Analysis <br /> 1.5 Retrofit Analysis with existing retrofit strategy <br /> 1.6 New retrofit strategy <br /> 1.7 Prepare Seismic Retrofit Strategy Report <br /> 1.8 Preliminary Cost Estimates <br /> 1.9 Attend Strategy Meeting <br /> 1.10 Issue Final Retrofit <br /> <br />2.1 Bridge Plans 18 <br />2.2 Special Provisions <br />2.3 Quantity/Estimates <br />2.4 Initial Plan Submittal <br /> : Labor Subi~tai: 18 <br /> <br />3.1 rndepdent Checking <br />3.2 Final PS&E Submittal 9 <br />3.3 Four Scale Plans <br />3.4 Final Engineers Estimate_s/_ ~pecification 3 <br /> Labor Subtotal 12 <br /> <br />4,1 Pre-Bid Meeting 4 <br />4.2 Respond to RFI 8 <br />4.3 Shop Drawing Rewew 4 <br />4.4 As-Built Plans <br /> Labor SUbtOtal! 16 <br /> <br />26 <br />12 <br /> <br />38 <br /> <br />72 92 <br />12 <br /> 8 3O <br /> <br />92 122 <br /> <br />100 30 <br />13 36 46 <br /> <br />4 12 15 <br />118 48 92 <br /> <br />8 20 <br />10 20 24 <br /> 6 <br />18 46 24 <br /> <br />(1) See page 3 "Manhours by Plan List" for hours breakdown by Structural Plans <br /> <br />246 <br /> <br />136 <br /> <br />890 <br /> <br />344 <br />24 <br />38 <br /> <br />136: 406 <br /> <br /> 130 <br /> 68; 172 <br /> <br /> 23 57 <br /> 90 360 <br /> <br />20 <br />2O <br /> <br /> 4 <br />36 <br />58 <br />26 <br />t 24 <br /> <br />77,957 <br /> <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> <br />28,464 <br /> 2,424 <br /> 2,957 <br /> 0 <br />33,845 <br /> <br />13,524 <br />14,232 <br /> 0 <br /> 4,744 <br />32,500 <br /> <br /> 567 <br /> 3,820 <br /> 5,273 <br /> 1,952 <br />1%612 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.