My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
W. Koo & Associates 1a
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
W-X (INACTIVE)
>
W. Koo & Associates 1a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:24:00 PM
Creation date
7/10/2003 9:37:27 AM
Metadata
Fields
Template:
Contracts
Company Name
W. Koo & Associates
Contract #
A-2003-130
Agency
Public Works
Council Approval Date
6/16/2003
Insurance Exp Date
9/30/2007
Destruction Year
2011
Notes
Amends A-1998-158 Amended by A-2005-104
Document Relationships
W. KOO & ASSOCIATES 1 - 1998
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
W. KOO & ASSOCIATES 1B - 2005
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL TO (.'ITY (IF SANTA ,4 NA P,4GE 22 <br />AMENDMENT TO BRIDGE RETROFIT CONTRACT <br />SEISMIC RETROPTT XTRA TEG Y <br /> <br />Preliminary seismic analysis will be performed. Seismic analysis will be based on the <br />preliminary geotechnical design memo produced by the project geotechnical engineer. The <br />analysis would include a 2-D push analysis of the bent(s), dynamic analysis based on the <br />proposed ARS curve per SDC 1.2, and estimated foundation stiffness of the as-built structure. <br />Foundation investigation will be conducted based on as-built information and available <br />subsurface information from adjacent structure(s). No subsurface investigation will be conducted <br />during the Seismic Retrofit Strategy Phase of this project. The analysis will dctcn~nine elastic <br />seismic displacement of the existing structure. Alternative retrofit strategies will be developed <br />based on the "as-built" model analysis. A minimum of two retrofit alternatives will be developed. <br />Same sets of analyses will be performed for the "retrofitted" structure to indicate the effectiveness <br />of the proposed retrofit strategy. <br /> <br />Seismic Retrofit Strategy Report will be prepared that contains the material as required under I&P <br />Guide 4-2. We will also prepare General Plan Estimates for all thc retrofit alternatives that have <br />been studied during the Seismic Retrofit Strategy process, and will confirm any proposed retrofit <br />that would involve foundation work following foundation recommendations contained in the <br />Preliminary Foundation Report. The subsurface investigation will be performed, if required, after <br />the approval of the seismic retrofit strategy. <br /> <br />We will attend a seismic retrofit strategy meeting to be held at Caltrans Division of Structure's <br />office in Sacramento. WKA will present the design, preliminary seismic design analysis and <br />preliminary design of colurnns and foundations to the Caltmns engineers. Approval of one <br />seismic retrofit strategy would signify the approval of the retrofit concept, and to continue toward <br />the final PS&E phase of the bridge design effort. <br /> <br />The project is assumed qualified for the Programmatic Exemptions for Seismic Retrofit projects, <br />and no environmental document will be needed for the proposed retrofit construction. It is <br />assumed that City will prepare all environmental document (including the PES form) in the <br />preparation of the consultant scope of work. <br /> <br />2- GEOTECHNICAL INVESTIGATION <br /> <br />Development of m~ effective seismic retrofit strategy would require the support from a <br />geotechnical consultant. In addition, because of the potential for additional foundation work, <br />them would also be need to conduct limited subsurface investigation to confirm the design of the <br />new foundation system as part of the seismic retrofit strategy. Earth Mechanics Inc, the original <br />geotechnical subconsultant on the seismic retrofit contract with the City of Santa Ana, will be <br />providing the geotechnical services. The scope of their services is included in Appendix B <br />herein. <br /> <br />3- UNCHECKED DETAILS SUBMITTAL <br /> <br />The bridge design will have prepared in accordance ~vith the codes and standards of Caltrans. <br />The following list summarizes the key design components of the structural improvements for the <br />proposed bridge widening and reconstruction. <br /> <br />1. All plans and design calculations will be prepared in English Units. <br /> <br />Page 4 of 22 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.