Laserfiche WebLink
Ms. Maya DeRosa <br />May 20, 2003 <br />Page 2 <br />1.5. Perform additional research per Template Committee (30 minutes per site). <br />1.6. Revise template per Template Committee (30 minutes per site). <br />Deliverable: Revised template (subtotal 1 hour per site; grand total 4.5 hours per <br />site) <br />The following assumptions apply to this Task. <br />• Staff will provide a monthly work request identifying properties to be categorized. <br />• Templates will be transmitted electronically. <br />• The times noted above per subtask are estimated and may deviate according to <br />variables such as the location of the property; the complexity of the building; <br />availability, type, and quantity of research material; and number of revisions <br />completed at the City's request in excess of the two iterations that are budgeted. <br />• City will be responsible for ownership, Assessor's parcel numbers, USGS Quad <br />information, and sketch maps required on the DPR forms. <br />• Two iterations of the templates are specified: one draft and one revision. <br />• City will continue to provide building permit access. <br />• City will continue to provide copies of relevant documentation. To date, SAIC has <br />received copies a variety of materials, most recently, the updated Office of Historic <br />Preservation Historic Resources Inventory Santa Ana database. <br />Task 2. Meetings. SAIC's Architectural Historian will attend up to 30 meetings as <br />follows: 12 Historic Resources Commission meetings (held on the first Thursday of each <br />month), 6 to 12 Template Committee meetings (currently scheduled on the second <br />Friday of each month or bimonthly), and 6 coordination meetings or telephone <br />consultations with Staff. For budgeting purposes, an average of 3.5 hours per meeting <br />has been assumed. <br />Task 3. Other Services. <br />From time to time and at the City's request, the Consultant will undertake additional <br />tasks such as those completed during the current contract period (e.g., assisting the City <br />with reconnaissance level surveys, providing additional documentation for the City to <br />submit to OHP, additional site inspections, etc.). A budget for such tasks has been <br />included in the current proposal. SAIC will notify the City when and if this budget is <br />depleted, or if any tasks would require budget augmentation. <br />SCHEDULE <br />The total project performance period is anticipated to be one year. <br />BUDGET/TERMS AND <br />10 E. Figueroa Street, Santa Barbara, CA 93101 (805) 564-6100 FAX: (805) 963-2431 <br />