My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ACCO 1 - 2002
Clerk
>
Contracts / Agreements
>
A
>
ACCO 1 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:20:27 PM
Creation date
7/24/2003 2:48:01 PM
Metadata
Fields
Template:
Contracts
Company Name
ACCO (previously Air Conditioning Company, Inc.)
Contract #
A-2002-184
Agency
Police
Council Approval Date
9/16/2002
Expiration Date
10/1/2003
Insurance Exp Date
10/1/2004
Destruction Year
2008
Notes
Amended by A-2003-120
Document Relationships
ACCO 1A - 2003
(Amended By)
Path:
\Contracts / Agreements\A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Annual Preventive/V/aintenance & Inspection Program <br /> for Rotary Screw Chillers <br /> <br />Ae <br /> <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10. <br /> <br />Operating Season Inspections <br /> <br />The following inspection items ensure your unit is operating reliably and efficiently t <br />through the cooling season. <br /> ... <br /> Iqspecting chiller and adjusting safety controls <br /> <br /> Checking operation of controls <br /> <br /> Checking oil and refrigerant levels <br /> <br /> Checking operation of lube system <br /> <br /> Checking the oil return system <br /> <br /> Checking operation of motor and starter <br /> <br /> Recording operating conditions <br /> <br /> Checking log and reviewing chiller and system operation with operator <br /> Conducting routine maintenance as recommended and required <br /> Logging and reporting repairs and parts that are required <br /> <br />The Annual Equipment Shutdown Inspection and PM <br /> <br />The following tasks are performed once each year during a shutdown period in order to - <br />properly evaluate your equipment status and prepare your unit for the next cooling <br />season; <br /> <br />1. Checking the Compressor-Motor Assembly for the following items and performing <br /> PM Tasks as indicated: <br /> <br />· Recording voltages <br />· Meging and recording motor winding resistance <br />· ........ Lubricating open motor <br />· Checking the alignment on open drive units <br />· Checking the coupling <br />· Checking seals <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.