Laserfiche WebLink
City of Santa Ana RFP for Traffic Counting Services, PROJECT 5512 <br />Work Plan -DATA Collection MANAGEMf NT APPROACH <br />Work Schedule <br />Data collection will begin week one following approval of the data collection Plan /Schedule. All <br />280 citywide ADTs can be completed within the required 2-months. All other counts will be <br />completed within 7-days of receiving work request from city point of contact. <br />Project Initiation <br />We understand the need for accurate count data. This information is essential in making <br />decisions relating to traffic studies, street design, signal warrant study and/or travel demand <br />analysis. Our state-of-the-art equipment coupled with the easy to use electronic database, and <br />customer defined printouts/data files of the collected data ensure that the information can be <br />easily understood and used for its intended purpose. <br />Upon contract award the SCC Santa Ana Project Team will initiate project planning with the city <br />point of contact (POC) to ensure an efficient, timely, accurate, and safe data collection plan is in <br />place before actual work commences. After proper coordination to ensure non-interference <br />from daily activities such as special events, and street sweeping, etc, and customer approval of <br />the data collection plan work will begin. All data collection activities will be coordinated as to <br />street location and type of count/activity. <br />Count Data Collection Methodology <br />Count Data will be collected as follows (on Tuesday, Wednesday, 8~ Thursday). No counts will <br />be taken on the eve of a holiday recognized by the City, days with inclement weather, during <br />construction activities or any other incident that disrupts the normal flow of traffic. Appropriate <br />changes in time frame will be done in order to compensate for days lost due to the <br />aforementioned. <br />Data will be available to the City as soon as requested counts are completed. The <br />summary/report will be prepared at our office using proprietary and COTS software. Upon <br />completion of data collection and summarization/breakdown, we will a-mail database files of the <br />counts and/or FAX a hard copy. Originals and diskette or CD copies will follow, in accordance <br />with the delivery schedule established by the City. Samples/examples of our products have <br />been enclosed. These sample reports/print-outs have been designed according to the needs of <br />various customers. The City will have the opportunity to select a format that will best serve their <br />needs. <br />24-hour Single/Dual-tube Counts: <br />• Locations are given to the Field Manager for review and collection planning. <br />• A site check is made to access the optimum machine location, flow and geometry of the <br />street segment. <br />• Data collectors meet with Field Manager minimum one (1) day before count to review <br />requirements, machine locations, and safety issues. <br />• Only experienced staff and state-of--the-art equipment will be used. <br />• Rubber hoses will be checked and damaged tube will be replaced. <br />3o May 2003 <br />Southland Car Counters <br />7 <br />