My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC COAST CABLING 1 - 2003
Clerk
>
Contracts / Agreements
>
P
>
PACIFIC COAST CABLING 1 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:18:09 PM
Creation date
9/10/2003 1:30:12 PM
Metadata
Fields
Template:
Contracts
Company Name
Pacific Coast Cabling
Contract #
N-2003-083
Agency
Finance & Management Services
Expiration Date
11/30/2003
Insurance Exp Date
1/1/2004
Destruction Year
2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
propos~[ for CITY OF SANTA ANA pacific coast cabLir~g <br />estimate ilo. E081903GNH-1254 8~ E081903GNH-1349 3 <br /> <br />3.0 <br /> <br />4.0 <br /> <br /> relatively minor physical damage, such as compression and kinks, can have <br /> major impact on system performance. <br />2.9 Separation distances between cable and EMI sources must be maintained. <br /> Reference TIA/EIA-569. <br />2.10 When practical att equipment shall be installed so as to be readily accessible <br /> for maintenance and shat[ be located so as not to interfere with servicing of <br /> other utilities or services. <br />CLEAN-UP <br />During the instaltation, on a daily basis, and upon completion of the work, Pacific Coast <br />Cabling shall remove all debris and waste material from the site of work and adjacent <br />work areas, and shat[ leave the facilities in a neat and orderly condition to the <br />satisfaction of the Client's Project Manager. During the duration of the installation and <br />construction phases, Pacific Coast Cabling shall maintain an attitude of safety, <br />cleanliness and tidiness. Subcontractor shall remove daily all scrap and waste <br />materials. Each day, Pacific Coast Cabling shatt leave the premises as orderly as when <br />he began construction. <br />SAFETY <br />4.1 Installation shall be designed and accomplished with safety as a primary <br /> consideration. The objective is to protect equally the public, the client and <br /> the contracting employees. <br />4.2 Pacific Coast Cabling shaU at att times exercise extreme care to reduce, to a <br /> minimum, the hazard of accidental injury to themselves and the public due to <br /> the presence and installation of wires and equipment particular to their trade. <br /> <br />specifications <br /> <br /> AG/Seg Room <br />TSR# 03-0327 Tasking <br /> <br />Rod conduit and leave pull string. <br />Provide and place (1) 4" box to single gang adapter, (1) 1-port facepiate and (1) CAT5E insert. <br />Provide and place (1) CATSE PVC cable in existing conduit from secure location to patch panel <br />Port 11 in IDF, Room 4M102. <br />Fire stop as needed. <br />Test and provide documentation. <br /> <br />PD Access Point Cabling <br />TSR# 03-0330 Tasking <br /> <br /> WAP//1 Third floor South Atrium <br />Provide and place (1) NEMA box above ceiling at access point. <br />Provide and place CATSE PL cable from access point to IDF Room 3205. <br />Provide and place cable support above lift out ceiling. <br />Provide and place (1) surface mount box with 1-port faceplate and CATSE insert in NENL¢ box. <br />Terminate on existing patch pane[ #4, jack #12. <br />Provide and place (10) feet 1" conduit into IDF. <br />Fire stop as needed. <br />Test and provide documentation. <br /> <br />INFORMATION PRESENTED IS FOR THE EXCLUSIVE USE OF CITY OF SANTA ANA <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.