Laserfiche WebLink
proposal for CITY OF SANTA ANA pacific coast cabling <br />estimate no. E081903GNH-t 254 e~ E081903GNH-1349 2 <br /> <br />statement of work <br /> <br />Contract Requirements: <br /> <br />If required, Pacific Coast Cabling shall provide Certificates of Insurance for General Liability, <br />Automobile Liability, Workers Compensation and Employers Liability naming the customer as <br />the insured. <br /> <br />Pacific Coast CabUng shall provide an installation that is compliant with industry standard <br />installation practices, TIA/EIA-568A, 569 specifications as well as NEC and local building codes. <br /> <br />Pacific Coast Cabling's price shall encompass all applicable tabor, cable support hardware and <br />consumables, to provide a structured cabling system solution. <br /> <br />1.0 <br /> <br />2.0 <br /> <br />Quality Assurance Installation Practices <br /> <br />INSTALLATION PRACTICES <br />All equipment shall be installed in a neat and professional like manner and to the <br />complete satisfaction of the Client. Any cable or material installed that does not meet <br />the installation specifications provided by the Statement of Work shall be replaced or <br />repaired to Client's full approval without additional cost. <br />INSTALLATION REQUIREMENTS <br />Installation procedures must meet or exceed the requirements listed below: <br />2.1 Installation and construction practices shat[ be in accordance with local utility <br /> practices and agreements, state, city and county ordinances, statutes and <br /> regulations, the National Electric Safety Code, TIA/EIA-568A, TIA/EIA-569, <br /> TIA/EIA-606 and TIA/EIA-607. <br />2.2 The Client's Standard Construction Specifications shall apply where applicable. <br />2.3 All equipment deemed necessary must be new and of the type specified in the <br /> BiJ[ of Materials. No substituted items shall be allowed except as specified or <br /> approved by the Client. No custom items shall be allowed except as specified <br /> or approved by the Client. <br />2.4 All wiring shall conform to the National Electric Code and all applicable Local <br /> Codes. <br />2.5 All racks and power supplies shall be earth grounded using //6 AWG, bare <br /> copper wire to local ground grid. Customer and its General Contractor are <br /> required to provide a terminal ground buss (TGB) in the area of the equipment <br /> racks. All building terminal ground buss (TGB) shaft be commonly connected to <br /> a main terminal ground buss (MTGB) located near the building's main power <br /> buss. <br />2.6 All cables routed through ceilings and building structure shall be supported <br /> with wire hangers independently installed at intervals that meet applicable <br /> federal, state and local building codes. Cables shall be routed in such a <br /> manner as to allow other maintenance activities to occur without damage to <br /> the cable. <br />2.7 Pacific Coast Cabling shall exercise due care in handling twisted pair so as not <br /> to damage the cable. Maximum pulling tension and bend radius pre and post <br /> installation shall be adhered to. <br /> Pacific Coast CabUng shall be responsible for scheduling and coordinating the <br /> cable placement with other activities, which may take place subsequent to <br /> cable placement. Notice is given that the cable construction is such that <br /> <br />2.8 <br /> <br />INFORMATION PRESENTED IS FOR THE EXCLUSIVE USE OF CITY OF SANTA ANA <br /> <br /> <br />