Laserfiche WebLink
proposal fo~ CITY OF SANTA ANA pacific coast cab/ir~ <br />estimate no. E081903GNH-1254 Et E081903GNH~1349 5 <br /> <br />pricing response <br /> <br />Pacific Coast CabLing wiJi implement the above Scope of Work, excluding options, [icense and <br />permits for the sum of: <br /> <br /> AG/Seg Room <br />TSR# 03-0327 Tasking <br />one hundred fifty-nine dollars and 36/100 (~159.$6) <br /> <br /> PD Access Point Cabling <br />TSR# 03-0330 Tasking <br />four thousand two hundred seventy-three dollars and 26/100 (~4,273.26) <br /> <br />terms conditions assumptions and caveats <br /> <br />It is the responsibility of the proposed client to notify Pacific Coast CabJing, prior to the start <br />of a project, of any asbestos contained materials (ACMs) in or around the area of the project <br />that may be disturbed. In the event that ACMs are present prior to job commencement or if <br />ACNLs are encountered during the project, additional costs, damages and/or deJays attributed <br />to necessary procedures for working in this environment wiJi be the responsibility of the <br />proposed client and/or building owner/management. An authorized agent or representative of <br />the building owner must sign an Asbestos Disclosure Form prior to job commencement for any <br />building built prior to 1978. <br /> <br />1. The information contained in this document is the sole property of Pacific Coast Cabling, <br /> Inc. and is intended to be used as evaluation and/or bidding information only. No part of <br /> this document may be reproduced and/or distributed to anyone except the listed recipients <br /> within this package without the written permission from Pacific Coast Cabling, Inc. <br /> <br />2. The cost of this project is based on information provided by the customer and is limited to <br /> those items specified within the document provided. Any changes to this quote must be <br /> agreed upon by all parties, in the form of a written change order, and may result in <br /> additional charges to the customer. ALl change orders must be signed by the customer <br /> prior to the commencement of the work specified in that change order. Horizontal station <br /> counts were taken directly from and calculated from the client's supplied drawings and <br /> consultant provided estimate documents. <br /> <br />3. Pacific Coast Cabling assumes reasonable capacity exists in pathway to install new cable. <br /> <br />Pacific Coast CabLing assumes that facility access will not cause delays on the part of the <br />customer. DeLays caused by other trades, end user, etc. will be charged at a $55.00 per <br />person, per hour rate. <br /> <br />5. Pacific Coast Cabling assumes that all station cable required for the entire project should <br /> be rated cable based on the information provided. <br /> <br />6. Certificates of Insurance wilt be submitted upon request. Special requirements, such as <br /> waivers of subrogation, may result in additional charges to the customer. <br /> <br />7. Pacific Coast Cab[ing's quotation is good for (30) days from the date of quotation. <br /> <br />INFORMATION PRESENTED IS FOR THE EXCLUSIVE USE OF CITY OF SANTA ANA <br /> <br /> <br />