My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC COAST CABLING 1 - 2003
Clerk
>
Contracts / Agreements
>
P
>
PACIFIC COAST CABLING 1 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:18:09 PM
Creation date
9/10/2003 1:30:12 PM
Metadata
Fields
Template:
Contracts
Company Name
Pacific Coast Cabling
Contract #
N-2003-083
Agency
Finance & Management Services
Expiration Date
11/30/2003
Insurance Exp Date
1/1/2004
Destruction Year
2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
proposal, for CITY OF SANTA ANA pacific coast cabli[~g <br />estimate no. E081903GNH-t 254 6t E081903GNH- 1349 6 <br /> <br />8. This quote is not intended to be used as an "Add 8: DeLete" schedule <br /> <br />9. If Pacific Coast Cabling crews are required to be on-site during move-in, system start-up, or <br /> first in service, this will be billed on a Time [~ Material basis. Pacific Coast Cabling wiLL <br /> have the account manager avaiLabLe during the project cut over on-caLl for any questions. <br /> <br />11. All work wiLL be done in accordance with [ocaL buildin~ codes ~ industry standards. <br /> <br />12. Testing of all cables wilt be done in accordance within the specifications supplied. <br /> <br />13. No walt repair or painting is included in this project. <br /> <br />14. No liquidated damages will be accepted. <br /> <br />15. Pacific Coast CabLing will require a written contract or purchase order prior to the start of <br /> this project. <br /> <br />16. ALl coring wiLL be provided by others. <br /> <br />17. Fire stopping of all penetrations through the floor, fire rated waLLs and ali sleeves instaLLed <br /> by Pacific Coast CabLin~ are included. <br /> <br />18. Payment terms are net 30. Invoice shall not be submitted or pre-dated ahead of verbal <br /> approval by City of Santa Ana Proj. tdana.qer that proiect scope is complete. (added) <br /> <br />19. 14o permit, license or bond(s) costs are included as a part of this response. <br /> <br />21. As-Builts ~[[ not be provided on disk E are not included in the cost of this project. Red <br /> lines, from customer provided base maps ~[[ be provided, at the end of the project. <br /> <br />INFORMATION PRESENTED IS FOR THE EXCLUSIVE USE OF CITY OF SANTA ANA <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.