Laserfiche WebLink
proposal, for CITY OF SANTA ANA pacific coast cabli[~g <br />estimate no. E081903GNH-t 254 6t E081903GNH- 1349 6 <br /> <br />8. This quote is not intended to be used as an "Add 8: DeLete" schedule <br /> <br />9. If Pacific Coast Cabling crews are required to be on-site during move-in, system start-up, or <br /> first in service, this will be billed on a Time [~ Material basis. Pacific Coast Cabling wiLL <br /> have the account manager avaiLabLe during the project cut over on-caLl for any questions. <br /> <br />11. All work wiLL be done in accordance with [ocaL buildin~ codes ~ industry standards. <br /> <br />12. Testing of all cables wilt be done in accordance within the specifications supplied. <br /> <br />13. No walt repair or painting is included in this project. <br /> <br />14. No liquidated damages will be accepted. <br /> <br />15. Pacific Coast CabLing will require a written contract or purchase order prior to the start of <br /> this project. <br /> <br />16. ALl coring wiLL be provided by others. <br /> <br />17. Fire stopping of all penetrations through the floor, fire rated waLLs and ali sleeves instaLLed <br /> by Pacific Coast CabLin~ are included. <br /> <br />18. Payment terms are net 30. Invoice shall not be submitted or pre-dated ahead of verbal <br /> approval by City of Santa Ana Proj. tdana.qer that proiect scope is complete. (added) <br /> <br />19. 14o permit, license or bond(s) costs are included as a part of this response. <br /> <br />21. As-Builts ~[[ not be provided on disk E are not included in the cost of this project. Red <br /> lines, from customer provided base maps ~[[ be provided, at the end of the project. <br /> <br />INFORMATION PRESENTED IS FOR THE EXCLUSIVE USE OF CITY OF SANTA ANA <br /> <br /> <br />