My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENVIRONMENTAL ENGINEERING 1
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
E-F (INACTIVE)
>
ENVIRONMENTAL ENGINEERING 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 4:53:06 PM
Creation date
9/17/2003 2:39:47 PM
Metadata
Fields
Template:
Contracts
Company Name
Environmental Engineering and Contracting (EEC)
Contract #
A-2003-171
Agency
Public Works
Council Approval Date
8/4/2003
Expiration Date
12/31/2005
Insurance Exp Date
10/31/2006
Destruction Year
2010
Notes
Amended by A-2004-073, A-2003-171-3
Document Relationships
ENVIRONMENTAL ENGINEERING 1A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\E-F (INACTIVE)
ENVIRONMENTAL ENGINEERING 1B
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\E-F (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3, Item 2 — EEC will assess the sewer laterals upstream Fixed Cost $33,000.00 <br />Sewer Lateral of the hot spots. It is assumed that 100 <br />CCTV CCTV lateral inspections will be required <br />Inspections pursuant to the scope of work for a fixed <br />cost. <br />Any increase or decrease in the number of Unit Cost <br />CCTV lateral inspections required will be $300.00 <br />assessed at a unit cost rate. <br />Time and Materials Cost Estimate <br />The scope of work required to complete the remainder of the work requested in the proposal will be <br />completed on a time and material basis. <br />The projected costs will be base on the projected time required to <br />complete the remainder of the tasks and the hourly rates for the individuals <br />performing these tasks. The <br />estimated costs are as follows: <br />Action Ouantit Units <br />Rate <br />Costs <br />Principal (Program Manager) 80 <br />Hours <br />$175/hr <br />$14,000.00 <br />Associate Engineer (Project 280 <br />Hours <br />$135/hr <br />$37,800.00 <br />Manager) <br />Consulting Engineer 40 <br />Hours <br />$125/hr <br />$5,000.00 <br />Project Engineer 40 <br />Hours <br />$95/hr <br />$3,800.00 <br />Sr. Staff Engineer 20 <br />Hours <br />$85/hr <br />$1,700.00 <br />Database Analyst 260 <br />Hours <br />$85/hr <br />$22,100.00 <br />Staff Engineer/Scientist. 120 <br />Hours <br />$75/hr <br />$9,000.00 <br />Data Entry/Clerical 80 <br />Hours <br />$50/hr <br />$4,000.00 <br />Mileage 600 <br />Miles <br />$0.42 <br />$252.00 <br />Misc. Material and Supplies $5,000 <br />Dollars <br />Cost plus 15% <br />$5,750.00 <br />Total Time <br />-and Material Cost Estimate <br />$103,402.00 <br />CS 3g) FOftN. C %Decamenrs and Sca nremvijlkata\ ocal Settmga\T� Iniemet FiWOIKIC\FOG Agree scat Package for uty Ait m .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.