My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENVIRONMENTAL ENGINEERING 1
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
E-F (INACTIVE)
>
ENVIRONMENTAL ENGINEERING 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 4:53:06 PM
Creation date
9/17/2003 2:39:47 PM
Metadata
Fields
Template:
Contracts
Company Name
Environmental Engineering and Contracting (EEC)
Contract #
A-2003-171
Agency
Public Works
Council Approval Date
8/4/2003
Expiration Date
12/31/2005
Insurance Exp Date
10/31/2006
Destruction Year
2010
Notes
Amended by A-2004-073, A-2003-171-3
Document Relationships
ENVIRONMENTAL ENGINEERING 1A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\E-F (INACTIVE)
ENVIRONMENTAL ENGINEERING 1B
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\E-F (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT B <br />ENVIRONMENTAL ENGINEERING AND CONTRACTING, INC. FEE SCHEDULE <br />The proposed costs are presented into two segments. The first is for the tasks which the City of Santa Ana <br />has requested to be proposed in as unit costs and, the second, will be presented as a time -and -material <br />estimate for the other portions of the RFP. The scope of work for these Tasks are detailed in the attached <br />Scope of Work section. <br />Unit Cost Estimate <br />Task Activity <br />Item Cost Total Cost <br />Task 2, Item 1 — EEC will inspect a minimum of 500 FSEs Fixed Cost $40,000.00 <br />FSE Inspections pursuant to the scope of work at the <br />identified cost. <br />The cost for each additional inspection or Unit Cost <br />removed inspection will be conducted at a $60.00 <br />unit cost rate (minimum of 400 required). <br />Task 3, Item 1 — EEC will assess the 54 hot spots - provide <br />Hot Spot CCTV oversight, review the CCTV data and <br />Inspections provide recommendations for each of the <br />hot spots at a unit cost rate. The Remainder <br />portion of this task will be conducted on a <br />time -and -material basis. <br />Time and Material Items <br />Sewer Line Cleaning <br />(72 hrs x $125 x 1.15 mark-up) <br />CCTV Inspections <br />(72 hrs x $165 x 1.15 mark-up) <br />Onsite Supervision (Project Engineer) <br />(24 hrs x $95/hr.) <br />Mileage <br />(100 miles x $0.42) <br />Unit Cost $18,360.00 <br />($345.00 <br />each for <br />the 54 hot <br />spots) <br />T&M $26,334.00 <br />$10,350.00 <br />$13,662.00 <br />$2,280.00 <br />$42.00 <br />CS 387 FOK C.�D um is a M. Satings`mOglmtaLLo Sntmgs`.Trnp Info Fflm�OLKICVOG Agrttnsnt Pahagc for city Aitornq,dtt <br />
The URL can be used to link to this page
Your browser does not support the video tag.