Laserfiche WebLink
physical dimensions layouts. <br />New single line drawing of all power distribution. <br />Revised power wiring and field instrumentation changes including conduit and wire. <br /> <br />Write specification including: <br />· Switchgear, Motor Control Center, Power Distribution <br />· Variable Frequency Drives / Solid State Starters <br />· Programmable Logic Controllers / Control Panel Field Instrumentation <br />· Pump Station - Sequence of Operation <br /> <br />4. Prepare design, drawing and specification review limitations with City of Santa Aha: <br /> · Initial Study design meetings with the City of Santa Aha ..................... limit of (3) meetings <br /> · Drawing and specification review meetings with the City of Santa Ana.....limit of (3) meetings <br />5. Insurance coverage to include: <br /> · Professional liability "errors and omissions" liability - $1,000,000 <br /> <br />NOT INCLUDED: <br /> <br />Submittal drawing review process of successful bidder. <br />Civil Engineering structural changes (by others). <br />Any planning for demolition or removal of asbestos or equipment containing or using asbestos. <br /> <br />FOR THE NET SUM OF: <br /> <br />$10.000.00 <br /> <br />TEN THOUSAND DOI J.ARS & NO CENTS <br /> <br />Payment terms: <br />Regards, <br /> /; <br /> <br />Craig Lamascus, P.E. <br />Harold Wells Associates <br /> <br />Net 30-days. <br /> <br />Santa Ana Proposal.doc 2 of 2 07/21/03 <br /> <br /> <br />