My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
P & D CONSULTANTS 1b
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
P (INACTIVE)
>
P & D CONSULTANTS 1b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 3:04:49 PM
Creation date
10/23/2003 11:11:09 AM
Metadata
Fields
Template:
Contracts
Company Name
P & D Environmental, a division of P & D Consultants
Contract #
A-2001-015
Agency
Planning & Building
Council Approval Date
2/5/2001
Expiration Date
12/31/2004
Insurance Exp Date
4/1/2005
Destruction Year
2009
Notes
Amends A-1999-129, 129A Amended by A-2003-196, A-2003-258
Document Relationships
P & D CONSULTANTS 1
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
P & D CONSULTANTS 1a
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
P & D CONSULTANTS 1c
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
P & D CONSULTANTS 1d
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Dan Bott • ! January 15, 2001 <br />City of Santa Ana Page 2 <br />in the project traffic analysis. This work has been completed and the traffic analysis was sent to <br />the City's Public Works Department for review and comment. It is noted that the new exit from <br />the parking garage and the location of the garage on Sycamore Street will affect the results of the <br />traffic study. Funds to pay for this additional analysis were taken out of the EIR Response to <br />Comments task budget. These funds will have to be replaced so responses to comments on the <br />project Draft EIR can be prepared when they are received. Please note that the original budget <br />for the Response to Comments task was a placeholder until all the comments were received and a <br />realistic estimate of the budget could be made. Should a significant number of comments be <br />received on the Draft EIR, additional funds could still be needed for completing the responses to <br />comments since only $9,930 was originally budgeted for this task. Given the project's impacts <br />to the historic structures along Broadway Street, it is now very likely that this will be the case. <br />The City's Public Works Department also requested that a sewer flow study be completed to <br />determine if there was sufficient capacity in the sewers in Broadway Street, Civic Center Drive <br />West and Main Street to handle flows from the One Broadway Plaza. P&D retained the services <br />of ADS Environmental Services to prepare the requested sewer flow study. P&D spent a number <br />of hours negotiating a contract with ADS and coordinating with them before, during and after the <br />Study was completed. This work was never budgeted in the project EIR budget. Great difficulty <br />was also encountered in meeting City insurance requirements before the Study could even be <br />started which required additional coordination time by P&D. Cost for this time is included in the <br />Project Management task discussed below. <br />The sewer flow study has been completed and it found that there is sufficient sewer capacity to <br />handle flows from One Broadway Plaza. The Study was sent to the City's Planning and <br />Building Agency and Public Works Department for review and approval. Information from the <br />Study will be included in the project EIR. Funds to pay for ADS' time were taken from the <br />Other Direct Costs budget for the project EIR and need to be reimbursed so that the Draft and <br />Final EIRs can be printed. Coordination time was taken out of the Project Management Budget <br />for preparation of the EIR. <br />Cost for the sewer flow study was as follows; <br />ADS (Sewer Flow Study) $6,200 <br />The total of the work previously approved by the City on the proj ect EIR was $13,200. <br />ADDITIONAL OUT OF SCOPE WORK NECESSARY TO COMPLETE THE PROJECT <br />EIR <br />As you recall, P&D sent the City the first screencheck Draft EIR on March 17, 2000 for review. <br />Comments were made on this document by you and Charles View, with other City departments <br />to review the second screencheck Draft EIR. We met to discuss your comments that were to be <br />incorporated into the next screencheck Draft EIR. <br />P&D had a second Screencheck Draft EIR almost ready for City review when we were asked by <br />the City to stop work on this document because the project applicant was proposing additional <br />
The URL can be used to link to this page
Your browser does not support the video tag.