Laserfiche WebLink
Mr. Dan Bott • • January 15, 2001 <br />City of Santa Ana Page 7 <br />Discovery Work's scope also includes time to analyze the feasibility of moving three historically <br />significant structures. This feasibility report will assist with the planning process of the project <br />and examine the possibility of moving the historic structures off the project site. The feasibility <br />report includes research and analysis of each structure, preliminary recommendations for <br />upgrades, constriction cost budgets and a general discussion of the impact of relocation on <br />historic designation for the structures that would need to be moved to make way for the project. <br />Discovery Works will work with an architect that deals with historic structures on the feasibility <br />report. The EIR subsection will have to be rewritten to include information on the removal of <br />additional structures and the feasibility of moving these structures to another location. <br />Cost to do this work is as follows: <br />Bob Rusby 3 Hrs. @ $125 Hr. $ 375 <br />Christine Huard -Spencer 4 Hrs. @ $135 Hr. $ 540 <br />Discovery Works (Revise the Cultural Resources Report) $ 5,500 <br />Discovery Works (Feasibility of moving historic structures )$ 9,025 <br />Total $15,440 <br />Section 5.0 Unavoidable Adverse Impacts <br />The Unavoidable Adverse Impacts section of the EIR has been completed. However, the <br />Cultural Resources discussion in this Section will have to be revised to indicate that the project <br />will now result in the removal of most of the historic structures along Broadway Street. It may <br />be possible to reduce this impact to less than significant levels if these structures can and are <br />moved off the project site. <br />Cost to do this work is as follows: <br />Env. Planner 1 Hr. @ $65 Hr. $ 65 <br />Section 6.0 Cumulative Impacts <br />This section of the EIR has been completed and will have to be revised to add the Orange County <br />Junior High School and High School of the Arts as cumulative projects. Figure 6.1-1 <br />(Cumulative Project Location Map) will have to be revised to add the schools to the Figure of <br />cumulative projects. The discussion on cultural resources will also have to be revised to reflect <br />the revised project Cultural Resources report. Any other revisions necessary as a result of the <br />updated traffic, air quality, and noise studies will also be incorporated. <br />Cost to do this work is as follows: <br />Bob Rusby 1 Hr. @ $125 Hr. $125 <br />Env. Planner 6 Hrs. @ $65 Hr. $390 <br />Jeff Post 2 Hrs. @ $60 Hi. $120 <br />Total $635 <br />