Mr. Dan Bott • • January 15, 2001 <br />City of Santa Ana Page 6 <br />Cost to do this work is as follows: <br />Bob Rusby <br />04 Hrs. @ <br />$125 Hr. <br />$ 500 <br />Env. Planner <br />08 Hrs. @ <br />S65 Hr. <br />$ 520 <br />Anne Pietro <br />20 Hrs. @ <br />$75 Hr. <br />$1,500 <br />Jeff Post <br />10 Hrs. @ <br />$60 Hr. <br />$ 600 <br />Total $3,120 <br />Noise <br />The noise section for the EIR had been prepared by P&D based on a noise study prepared by <br />Mestre Greve. However, the noise study will need to be revised based on changes to the project <br />site plan and traffic. Construction noise impacts will be recalculated based on the new site plan. <br />Impacts and mitigation measures will be reassessed. Future with and without project traffic <br />noise levels will be recalculated based on the revised traffic data. Off -site traffic noise impacts <br />will be recalculated. Any new impacts will be identified and mitigation measures will be <br />developed. Traffic noise impacts on the project site will be reassessed along with the required <br />mitigation measures. <br />Potential noise impacts from the proposed heliport will be assessed. Both daily coverage (i.e. <br />CNEC) and single event (i.e. maximum) noise levels will be examined. Any significant impacts <br />or sensitive receptors will be identified. The exhibit showing noise contours in the noise study <br />will be updated to show the new site plan. P&D will revise the noise section of the EIR based on <br />the revised noise study. <br />Cost to do this work is as follows: <br />Bob Rusby 2 Hrs. @ $125 Hr. $ 250 <br />Env. Planner 4 Hrs. @ $ 65 Hr. $ 260 <br />Jeff Post 2 Hrs. @ $ 60 Hr. $ 120 <br />Mestre Greve $7,200 <br />Total $7,830 <br />Cultural Resources <br />Discovery Works, Inc. completed the project Cultural Resources Report and this section was <br />included in the first screencheck Draft EIR, Since that time it has been determined that another <br />exit from the parking garage onto Broadway Street will be developed which will result in the <br />removal of another historic structure along Broadway Street. As a result, the Cultural Resources <br />Report will need to be rewritten to discuss the direct impacts to the historic structures along <br />Broadway Street, review alternatives to their removal, and develop mitigation measures to <br />reduce project impacts to the extent possible. Discovery Work's scope to revise the Report is <br />attached to this letter for your information. <br />