Laserfiche WebLink
.. • <br />SCOPE OF WORK <br />TASK 3.0 - DRAFT DESIGN AND DEVELOPMENT <br />STANDARDS MANUAL <br />TASK 3.1 - DRAFT DESIGN AND DEVELOPMENT <br />STANDARDS MANUAL <br />Upon completion of the Preliminary Draft document and conducting of <br />the Planning Commission Study Session and Staff Review Committee <br />Meeting, RBF/UDS will commence the development of the DraftDesign <br />and Development Standards Manual <br />This draft will include all exhibits, graphics and photographs to be <br />included in the final document. <br />TASK 3.2 - STAFF REVIEW COMMITTEE MEETING OF <br />DRAFT MANUAL <br />Upon completion of the Draft document, RBF/UDS will participate in <br />an additional meeting with the Staff Review Committee. This meeting <br />will provide final minorchanges to the document brought about through <br />the Planning Commission Study Session <br />The RBF/UDS team will provide all presentation materials and provide <br />City staff with summary notes of the meeting. <br />TASK 3.3 - PLANNING COMMISSION STUDY SESSION <br />Upon completion of the Draft Design and Development Standards <br />Manual, UDS/RBF will commence an additional Study Session with the <br />Planning Commission. This Study Session will provide an overview of <br />the Draft document and illicitcomments from the Planning Commission. <br />DESIGN AND DEVELOPMENT STANDARDS JANUARY26, 2002 <br />CITY OF SANTA ANA PACE 2 - 7 <br />