Laserfiche WebLink
SCOPE OF WORK <br />design concepts or standards. A minimum of one new graphic for each <br />design concept has been budgeted. <br />TASK 2.4 STAFF REVIEW COMMITTEE MEETING <br />Upon completion of the Preliminary Draft document, RBF/UDS will <br />participate in a meeting with the Staff Review Committee. Thismeeting <br />will be a workshop format, where each participant will be involved in <br />section by section review of the draft document to identify areas which <br />may need supplementary information. <br />The RBF/UDS team will provide all presentation materials and provide <br />City staff will a note summary. <br />TASK 2.5 PLANNING COMMISSION STUDY SESSION <br />Upon completion of the Preliminary Draft of the Design and <br />Development Standards RBF/UDS will prepare a PowerPoint <br />presentation to the Planning Commission. This Study Session will <br />provide an overview of the process, explain each of the sections of the <br />documents and seek input from the Planning Commission. <br />DESIGN AND DEVELOPMENT STANDARDS IANUARI'26, 2002 <br />CITY OF SANTA ANA PACE 2 - 6 <br />