My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - 2100 W. Alton Ave.-YMCA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
01/20/2004
>
31A - 2100 W. Alton Ave.-YMCA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:03:17 PM
Creation date
1/16/2004 3:18:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
1/20/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
According to the Santa Ana Fire Department, the goal of the fire <br />department is to have an onsite response, time of 5:00 or less <br />80% of the time. Fire Station No. 6 located at 950 West <br />MacArthur Boulevard is the closest fire station to the project <br />site. Presently, a shift at Fire Station No. 5 consists of six <br />fire fighters, 1 fire truck, and 1 fire engine. Additionally, <br />Fire Station No. 9 at 1320 East Warner is also within the <br />project area. <br /> <br />The proposed project would result in an increased demand for <br />fire protection and emergency services within the project area. <br />The Santa Aha Fire Department has indicated that under existing <br />levels of manpower and equipment, it does not anticipate any <br />significant constraints in providing adequate fire protection <br />services to the proposed project. The existing fire stations in <br />the project area would be able to adequately respond to project- <br />related demand for fire and emergency services. <br /> <br />Police Protection: Less Than Significant Impact <br /> <br />The Santa Ana Police Department would provide police protection <br />services for the proposed project. The Police Department is <br />headquartered at 60 Civic Center Plaza. <br /> <br />The City of Santa Ana is subdivided into four policing <br />districts, with each district serving a section of the~City. <br />The proposed project is located within Reporting District 190 <br />within the Southeast District. The Reporting District is <br />considered to be an average crime area, compared to other areas <br />in the City. <br /> <br />Implementation of the propose~ project would increase the demand <br />for police protection services. The Santa Ana Police Department <br />has indicated that under existing levels of manpower and <br />equipment, they would have the ability to provide adequate <br />police protection services. <br /> <br />School Facilities: No Impact <br /> <br />The project site is within the boundaries of the Santa Ana <br />Unified School District (SAUSD). Implementation of the proposed <br />project would not generate additional students within the Santa <br />Ana Unified School District. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.