Laserfiche WebLink
Environmental Checklist <br /> For CEQA Compliance <br /> <br />Issues & Supporting Information Sources <br /> <br />Exceed, either individually or cumulatively, a level <br />of service standard established by the county <br />congestion management agency for designated <br />roads or highways? <br /> <br />Result in a change in air traffic patterns, including <br />either an increase in traffic levels or a change in <br />location that results in substantial safety risks? <br /> <br /> Potentially <br /> Significant <br />Potentially Unless Less Than <br />Significant Mitigation Significant No <br />Impact Incorporated Impact Impact <br /> <br />D. Substantially increase hazards to a design feature <br /> (e.g. sharp curves or dangerous intersections) or <br /> incompatible uses (e.g. farm equipment)? <br /> <br />E. Result in inadequate emergency access? <br /> <br />F. Result in inadequate parking capacity? <br /> <br />G. Conflict with adopted policies supporting alternative <br /> transportation (e.g. bus turnouts, bicycle racks)? <br /> <br />XVl. Utilities and Service Systems <br /> <br />Exceed wastewater treatment requirements of the <br />applicable Regional Water Quality Contrql Board? <br /> <br />Require or result in the construction of new water <br />or wastewater treatment facilities or expansion of <br />existing facilities, the construction of which could <br />cause significant environmental effects? <br /> <br />Require or result in the construction of new storm <br />water drainage facilities or expansion of existing <br />facilities, the construction of which could cause <br />significant environmental effects? <br /> <br />Are sufficient water supplies available to serve the <br />project from existing entitlements and resources or <br />are new or expanded entitlements needed? <br /> <br />Result in the determination by the wastewater <br />treatment provider which serves or may serve the <br />project that it has adequate capacity to serve the <br />project's projected demand in addition to the <br />pravider's existing commitments? <br /> <br />md~nsword~envcheck.doc~1.15.99 <br /> <br />par. 41 0 3 <br /> <br />3,:A. <br /> <br /> <br />