Laserfiche WebLink
Alongside with the general improvernents listed above, Fiesta Parking Structure requires: <br />• Improve neon light fixture 'Downtown Santa Ana" <br />• Exterior and interior concrete patch work where needed <br />• Option to color parking structure pillars to its' corresponding floor <br />• Stair improvernents (add reflective grip and paint where needed) <br />• Removal of unused planters, cabling and fencing <br />• Design and install lighting along NE wall on Bush St for future murals <br />• Elevator Modernization - evaluate condition and performance of an existing elevator in need of <br />repair. <br />Alongside with the general improvernents listed above, 5"' and Main Parking Structure requires: <br />• Install of missing tension cables outside of exterior rails <br />• Add lighting alongside N Main St below 'DTSA' sign for future Murals <br />• Elevator Modernization - evaluate condition and performance of an existing elevator in need of <br />repair. <br />Alongside with the general improvements listed above, 3 rd and Birch Parking Structure requires: <br />• Public parking sign replacement <br />City of Santa Ana RFP 24-1 OOA <br />Page A1-2 <br />