My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDS GROUP (8)
Clerk
>
Contracts / Agreements
>
I
>
IDS GROUP (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 1:55:11 PM
Creation date
3/5/2025 12:52:09 PM
Metadata
Fields
Template:
Contracts
Company Name
IDS GROUP
Contract #
A-2025-017
Agency
Public Works
Council Approval Date
2/18/2025
Expiration Date
2/17/2027
Insurance Exp Date
5/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. CIVIL ENGINEERING PLANS. The consultant shall beresponsible for the preparation of <br />any civil engineering plans required for this project induding,butnut|imoitedto,the <br />fn||ovxin@C Horizontal and Vertical Control plan, On -site Grading and Drainage plan, Site <br />Utility Plan, and plans to include improvements in the public right'uf'vvay,asapplicable. <br />G. LANDSCAPE AND IRRIGATION PLANS. The consultant shall beresponsible for <br />the preparation ofany landscape architectural plans required for this project induding, <br />but not limited to, the following; Site Layout/Construction Plans and Details including <br />all architectural feature components identified in the introduction portion of this RFP, <br />Site Sections (as applicable), and Planting and Irrigation (plans, Details, Notes, <br />H. ARCHITECTURAL PLANS. The consultant shall be responsible for the preparation of any <br />architectural plans required for this project including, but not limited to, Foundation <br />Plan, Floor Plan, Framing Plan, Reflected Ceiling Plan, Door/Window/Hardware/Finish <br />Schedules, Building Sections, Interior and Exterior Elevations, Architectural Detailing, <br />Structural Engineering, ADACompliance. <br />MECHANICAL/ELECTRICAL/PLUMBING (MEP) PLANS. The consultant shall be <br />responsible forthe preparation of any MEP electrical plans required for this project <br />including HVACsystenn, electrical site & floor plans, location of panels, amitchgear, <br />meters, schedules, details, photometric analyses, and general notes. <br />J. PERMITTING. The consultant shall be responsible for identifying and applying for any <br />necessary permits. All permit requirements shall be included in the bid package for the <br />project, as applicable. <br />K. PLANS, SPECIFICATIONS AND ESTIMATES /PS&E\ <br />o Development ofPlans, Specifications and Estimate (PS6tB): <br />a) All reports, plans, specifications and quantity calculations shall conform tocriteria, policies, procedures <br />and standards of the City. The Cuooukuot obul| use the boilerplate for cut sheets, specifications and <br />estimates provided bvthe City. <br />b) The p\mo development shall include three (3) milestone deliverables-- 0Y4, 60%, qU% (pre-final)and <br />100% (final). All plan sheets shall be prepared at a reasonable standard scale to be noted on plans. The <br />ncocxyury plans for each PSJ&E package shall include, but are not be limited to: <br />TmmkJ/ <br />Preliminary design phase shall include Kick-off meeting with City Staff todiscuss scope oil'*nrk <br />project goals and objectives, potential elements and issues, schedule. <br />Task 2: Design Development (60% plans) <br />Design development phase will involve development of plans based upon Task linformation and <br />City of Santa Ana FZFP 24-1 OOA <br />
The URL can be used to link to this page
Your browser does not support the video tag.