Laserfiche WebLink
Deliverables from this task shall include a 60% set of plans, draft Outline specification and <br />"Opinion of Probable Cost. <br />Task 3: Construction Documents (90% and 100% plans) <br />Construction Documents phase (CDs) shall include finalizing plans and specifications from the Design <br />Development phase. This includes the provision of detailed engineering and construction drawings <br />that will serve as the basis for both bidding and construction by a general contractor. <br />Deliverables from this task shall include 90% and 100% plans, final technical specifications, and a <br />finalized "Opinion of Probable Cost". <br />Plans shall include, but are not limited to the following: <br />* Title Sheet <br />* Civil Engineering <br />o Site Utility Plan <br />* Landscape Architectural <br />o Site Layout/Construction Plans And Details (including plumbing) <br />o Site Sections, as applicable <br />o Planting Plans/Details/Notes <br />o Irrigation Plans/'Details/Calculations/Notes <br />Architectural <br />o Construction Plans <br />o Signage Plans <br />o Reflected Ceiling Plans <br />o Mechanical and Plumbing Plans/T-24 <br />o Electrical Plans, as applicable <br />o Entire Building Floor Plan <br />o Interior Elevations, as required <br />o Building Sections, as required <br />o Architectural Details, as required ADA Path of Travel design and/or signage Plan <br />Mechanical Engineering & Plumbing <br />Electrical Engineering <br />o Single line diagram <br />o Location of panels, switchgear, meters <br />o Schedules <br />o General Notes <br />o Details <br />Plans shall be submitted at 90% completion for City staff review, and revised per City comments to <br />produce a 100% complete construction drawing package. It is imperative that the consultant exercise <br />care and completeness when implementing plan check comments, to keep project moving more as <br />expeditiously as possible. The City will then conduct one more cursory review prior to obtaining all <br />final approvals and signatures. <br />Technical Specifications <br />Technical specifications for all components listed above shall be provided by Consultant, or their <br />SUbconSUltants, to the City in CSI (Construction Specifications Institute) format. City Staff will <br />combine these specifications with the City Boiler Plate which together, will become the Project <br />Manual. <br />City of Santa Ana RFP 24-1 OOA <br />Page Al-5 <br />