Table 2B ENERGY AND OPERATIONAL SAVINGS BY FINFSITE
<br />
<br />Facility FIM Annual Annual Annual Annual Per Unit Annual Annual
<br /> KWH Therms Chilled Steam $Cost Energy Operations
<br /> Savings Savings Water Savings $Savings Savings
<br /> Savings
<br />City Lighting 476,313 .$15/KWH $71,297 $14,684
<br />Hall/Main
<br />Library
<br />City VAV 472,260 88,620 193,200 .15/KWH; $102,887 $16,512
<br />Hall/Main Retrofit/Controls Units lbs. .29861/
<br />Library BTU Unit
<br /> CW;
<br /> .0257/per
<br /> lb. Steam
<br />City Elevator Motor 83,120 .$15/KWH $12,468 $0
<br />Hall/Main Replacement
<br />Library _
<br />Ross Lighting 93,147 .$15/KWH $13,972 $2,562
<br />Annex
<br />Corporation Lighting 143,427 .$15/KWH $21,514 $5,927
<br />Yard
<br />Corporation HVAC VF 29527 .$15/KWH $4,429 $1,230
<br />Yard Motors/Controls
<br />Main New Windows 12,000 .$15/KWH $1,802 $1,230
<br />Library
<br />New Hope Lighting 35,794 .16/KWH $5,727 $I,742
<br />Library _
<br />New Hope HVAC 14,088 .16/KWH $2,254 $0
<br />Library Replacement
<br />Parks and Lighting 86,250 .16/KWH $13,800 $3,280
<br />Recreation
<br />Parks and Sr. Center 23,375 .16/KWH $3,740 $0
<br />Recreation HVAC
<br /> Replacement
<br />Parks and Corbin Center 4,994 .16/KWH $799 $1,025
<br />Recreation HVAC
<br /> Replacement
<br />Parks and Boiler 3,633 .54/Therm $1,962 $0
<br />Recreation Replacement
<br />Parks and Pool Cover 3,781 .54/Therm $2,042 $0
<br />Recreation
<br />Police Lighting 308,914 .14/KWH $43,248 $14,083
<br />Facility
<br />Police Chiller VSD 64,900 .14/KWH $9,079 $0
<br />Facility
<br />Police 911 Isolation 0 N/A $0 $0
<br />Facility
<br />Totals: 1,848,109 7414 88,620 193,200 $311,026 ~62,273
<br /> Units lbs.
<br />
<br />3
<br />
<br />
<br />
|