My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS BUILDING TECH 1 -2003
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS BUILDING TECH 1 -2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 11:36:44 AM
Creation date
1/23/2004 10:25:00 AM
Metadata
Fields
Template:
Contracts
Company Name
Siemens Building Technologies, Inc.
Contract #
A-2003-022
Agency
Finance & Management Services
Council Approval Date
2/3/2003
Expiration Date
3/1/2014
Insurance Exp Date
10/1/2008
Destruction Year
2019
Notes
Amended by A-2003-022-01
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The annual energy savings for each FIM has been calculated by Contractor based on the contribution <br />of each improvement. Lighting FIM's have been designed to reduce electrical load by utilizing 3~a <br />generation light and ballasts, General Electric Ultra. The lighting levels in each area are accomplished <br />by an equal number of lamps having the same lumen as currently installed. Temperature comfort is <br />based on the same current level of Minimum 70 deg F to a Maximum of 72 deg F at thermostats. <br /> <br />(Section 3 reserved) <br /> <br />Section 4. Measurement and Verification Plan <br /> <br />4.1 <br /> <br />General Overview- <br /> (a) The purpose of the Measurement and Verification (M&V) article is to identify the <br /> methods, measurements, procedures and tools that will be used to verify the savings for <br /> each FIM. Savings were determined by comparing prior usage, consumption or <br /> efficiencies defined as the Baseline to the selected FIMs being implemented against the <br /> post FIM implementation usage, consumption or efficiencies. The Baseline usage, <br /> consumption or efficiencies is described in this Exhibit D, Article 5. The usage, <br /> consumption or efficiencies associated with the FIM implementation is defined as the <br /> Contracted Baseline, and are described in this Exhibit D, Article 7. <br /> (b) The actual guaranteed savings associated with this contract are outlined in this Exhibit <br /> D, Article 1 - Table 1 and Article 2 - Table 2A/B of this contract. <br /> <br />4.2 Option A- Main Meter Comparison <br /> <br />Lighting Retrofits, HVAC and Controls <br /> <br />4.2.1 General. Except as otherwise provided, energy savings will be calculated for each month of <br />each Annual Savings Period as the product of(a) "units of energy saved" (kWh, Therms, GJ, etc.) <br />multiplied by (b) "cost of energy". <br /> 1. Units of energy saved are computed by the "Metrix" software application. "Metrix" is <br /> an accounting software application copyrighted by SRC Systems, Inc. Units of energy saved <br /> are calculated by subtracting current period measured units of energy consumed from the <br /> adjusted Baseline units of energy defined in Article 5. Adjustments to the Baseline energy <br /> traits are based on factors such as weather, occupancy, operating hours, etc., and changes to the <br /> Contracted Baseline conditions and operating practices as defined in Article 7). <br /> <br />2. Costs of energy are defined in Article 6, Utility Rate Structures and Escalation Rates. <br /> <br />Sources of Data. For each month of the base year and each month of the term of the contract, data <br />shall be obtained as follows: <br />Weather - weather data shall be obtained from the National Weather Service, NOAA or Accuweather <br />for the nearest weather station to the Facility. Energy Use - Electricity usage data shall be obtained <br />from the electric utility bills. Since meters are not usually read on the same day each month, monthly <br />usage shall be determined by apportioning billed usage assuming a constant daily usage between meter <br />readings. Usage for most months will, therefore, be derived from two bills. Before the start of the <br /> <br />4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.