My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS BUILDING TECH 1 -2003
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS BUILDING TECH 1 -2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 11:36:44 AM
Creation date
1/23/2004 10:25:00 AM
Metadata
Fields
Template:
Contracts
Company Name
Siemens Building Technologies, Inc.
Contract #
A-2003-022
Agency
Finance & Management Services
Council Approval Date
2/3/2003
Expiration Date
3/1/2014
Insurance Exp Date
10/1/2008
Destruction Year
2019
Notes
Amended by A-2003-022-01
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.3 <br /> <br />4.3.1 <br /> <br />4.3.2 <br /> <br />If a rate structure change eliminates a component of the bill previously charged for (e.g. kW, <br />kVAR, transportation or Power Factor,) then the elimination of that charge will be calculated as <br />a savings and added to the monetary savings. <br /> <br />Option B- Designated <br /> <br />Windows <br />The savings from replacing windows at the Main Library will be designated based on <br />calculations using the Market Manager building simulation software and 30-year average <br />weather data for Los Angeles. The savings are based on a 8760-hour-simulation of the <br />buildings based on input construction, occupancy, thermostat and lighting/equipment use <br />parameters, and reconciliation with baseline utility bills. <br /> <br />Pool Heater Replacement and Pool Covers <br />The therm savings from improved efficiencies of heaters being replaced at Salgado, Memorial, <br />Santa Anita, Jerome and E1 Salvador pools, and the pool cover at Salgado, will be designated <br />based on calculations using the Energy Smart Pools, a public-domain swimming pool <br />simulation software, supported by the Department of Energy. <br /> <br />4.3.4 <br /> <br />Elevator Motor and Controls Replacement <br />The savings from replacement of elevator motors and controls (MG set to VFD control) will be <br />designated based on calculations provided by Thyssen. The calculations are based on a 10- <br />hour, 5.5 days/week, 50 weeks/hr operation for the City Hall (9-story building). <br /> <br />Section 5: baseline data <br /> <br />5.1 <br /> <br />The annual period(s) selected as the Baseline period starts on Aug 01 2001 and ends on July 31 <br />2002 for electricity, starts on June 19 2001 and ends on June 18 2002 for chilled water and <br />steam; starts on Jan 01 2001 and ends on Dec 31 2001 for gas. This Baseline facility utility <br />consumption will be used as the reference that future years utility usage will be compared to in <br />order to determination the Annual Savings. <br /> <br /> The meters used for determining the baseline utility data are listed below: <br /> <br />Table 5.1.1 Electric Meter/Gas Account Information <br /> <br />Building Electric Gas <br />City Hall & V349E-00373 N/^ <br />Main Library <br />Police V349E-002703 N/A <br /> V349E-002704 <br />Corporate Yard V349E-007127 096-310-0800 <br />Ross Annex P0826-010599 013-457-8823-4 <br />Newhope P0714-003496 095-111-1600 <br />Library <br />Corbin Center TP881-001754 014-308-5400 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.