Laserfiche WebLink
�J <br />0 <br />Attachment 1 B — Statement of Work and Project Schedule <br />City of Santa Ana <br />Hereinafter Referred to as CONTRACTOR <br />AB 2766 Contract Number S0102B <br />Project Schedule <br />Task <br />Start <br />Completion <br />Station Construction Specification Complete <br />July, 2001 <br />Station Construction Bid Award <br />October, 2001 <br />Station Construction <br />October, 2001 <br />May, 2002 <br />Order Vehicles (Elgin Broom Bear Sweeper <br />with Cummins 8.3G+, 250 hp CNG engine) <br />July, 2002 <br />February, 2003 <br />Deliver Vehicles <br />October, 2003 <br />Monitor Performance <br />October, 2003 <br />February, 2004 <br />Quarterly Reports <br />October, 2001 <br />Completion of <br />Project <br />Annual Reports <br />12 mos. after <br />first vehicle is <br />placed into <br />service. <br />60 mos. after last <br />vehicle is placed <br />into service. <br />Final Report <br />March, 2004 <br />Hardware: Four alternative fuel vehicles as listed above. CNG Fueling Station and <br />Equipment. <br />Reports <br />Quarterly Reports: CONTRACTOR shall monitor the project and prepare and submit <br />quarterly progress reports. The first report is due the 15`" day of the fourth month after <br />the date of Contract execution. Quarterly reports shall include, but are not limited to <br />achievement of milestones; equipment activity, including documentation of total vehicle <br />miles and/or engine operating hours accumulated; vehicle performance; any project <br />delays or problems and solutions; summary and analysis of project results to date; <br />fueling site status; preliminary findings, and recommendations for completion of project; <br />station activity including fuel throughput for each month during the quarter (with <br />supporting documentation) and any downtime; identification of any unexpected <br />circumstances or potential problems with the project, especially those that may delay <br />the project schedule; and recommendations to resolve problems. Progress Reports that <br />do not comply will be returned to the CONTRACTOR as inadequate. <br />Annual Reports: Emissions reductions shall be quantified on an annual basis. The <br />CONTRACTOR shall report the required data to the AQMD for a period of five years. <br />Emissions reductions shall be calculated by the MSRC/AQMD staff utilizing the current <br />