My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Coast Air Quality 1b
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
S (INACTIVE)
>
South Coast Air Quality 1b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:30:47 PM
Creation date
2/25/2004 3:11:15 PM
Metadata
Fields
Template:
Contracts
Company Name
South Coast Air Quality Management District
Contract #
A-2001-003B
Agency
Public Works
Council Approval Date
1/16/2001
Expiration Date
3/30/2004
Destruction Year
2009
Notes
Amends A-2001-003A, A-2001-003A1
Document Relationships
South Coast Air Quality 1
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\S (INACTIVE)
South Coast Air Quality 1a
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\S (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 B — Statement of Work and Project Schedule <br />City of Santa Ana <br />Hereinafter Referred to as CONTRACTOR <br />AB 2766 Contract Number S0102B <br />Air Resources Board (ARB) quantification methodologies. Reported and validated <br />emission reductions shall be applied toward the State Implementation Plan (SIP) <br />attainment demonstration. All emission reductions resulting from the expenditure of <br />these funds shall be owned wholly by the AQMD, shall not be converted into tradable <br />credits and shall be used for the sole purpose of meeting the attainment schedule <br />contained in the most recently adopted SIP. AQMD reserves the right to verify the <br />information provided. CONTRACTOR shall report the following data annually: <br />Annual mileage or engine operating hours (where applicable) accumulated, using the <br />contracted -for equipment within the geographical boundaries of the AQMD. <br />The reporting requirements under this clause shall survive the expiration of this Contract <br />and continue in full force and effect until a total of five (5) consecutive years of <br />emissions data has been reported to AQMD. Annual reporting begins after first vehicles <br />are entered into service. <br />Final Report: A final report shall be submitted by the CONTRACTOR in the format <br />provided by AQMD staff. Report shall include, at a minimum: a) an executive summary; <br />and b) a detailed discussion of the results and conclusions of this project including the <br />manner in which any replaced vehicles were retired. CONTRACTOR will identify any <br />barriers encountered and solutions developed to overcome the barriers, impact on <br />vehicle operating costs and impact of project on future alternative fuel deployment and <br />near and long term AFV goals. <br />In the event the CONTRACTOR files for bankruptcy or becomes insolvent or <br />discontinues this project, the following items revert to the AQMD for disposition into the <br />AB 2766 Discretionary Fund account: <br />none <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.