My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GROUP W. CABLE INC. (ADELPHIA) 1 -1982
Clerk
>
Contracts / Agreements
>
C
>
CABLE
>
GROUP W. CABLE INC. (ADELPHIA) 1 -1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2016 12:12:56 PM
Creation date
4/19/2004 3:16:51 PM
Metadata
Fields
Template:
Contracts
Company Name
Group W. Cable, Inc. (Adelphia)
Contract #
A-82-39
Agency
Parks, Recreation, & Community Services
Council Approval Date
4/19/1982
Expiration Date
2/20/2005
Destruction Year
P
Notes
Amended by A-83-15, A-85-2, A-89-013A, A-02-070, A-03-031, A-04-169 and A-05-029
Document Relationships
ADELPHIA 1D - 2002
(Amended By)
Path:
\Contracts / Agreements\C\CABLE
ADELPHIA 1E - 2003
(Amended By)
Path:
\Contracts / Agreements\C\CABLE
ADELPHIA 1F - 2004
(Amended By)
Path:
\Contracts / Agreements\C\CABLE
ADELPHIA 1G - 2005
(Amended By)
Path:
\Contracts / Agreements\C\CABLE
COMCAST (ADELPHIA) 1C - 1989
(Amended By)
Path:
\Contracts / Agreements\C\CABLE
GROUP W. CABLE INC. (ADELPHIA) 1A -1983
(Amended By)
Path:
\Contracts / Agreements\C\CABLE
GROUP W. CABLE INC.( ADELPHIA) 1B -1985
(Amended By)
Path:
\Contracts / Agreements\C\CABLE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.. ,," <br /> <br />, ' <br /> <br />j <br /> <br />such proposals shall not be unreasonably withheld and its <br />decision shall be given to Grantee, in writing, within thirty <br />(30) days of receipt of Grantee's notification. <br /> <br />4.7 Erection of Poles and Undergrounding. If additional <br />poles in an existing utility system route are required, <br />Grantee shall negotiate with the utility company for the <br />installation of the needed poles or Grantee may at its option, <br />subject to the prior approval of Grantor, construct necessary <br />poles. Grantee shall negotiate the lease of pole space and <br />facilities from the existing pole owners for all aerial <br />construction, under mutually acceptable terms and conditions. <br />Grantor shall utilize its best efforts to assist in arriving <br />at an equitable pole rental agreement. Grantee shall provide <br />underground facilities where appropriate and in accordance <br />with Grantor's underground schedule for utilities, and shall <br />comply with the provisions of Sections 34-82 et~. and <br />Chapter 37 of the Santa Ana Municipal Code. Grantee agrees <br />to restore roads- streets, alleys, avenues, highways, canals, <br />ditches or flumes used for construction, operation, or main- <br />tenance of cables to at least the same condition, to the <br />reasonable satisfaction of Grantor's Director of Public <br />Works, as said roads, streets, alleys, avenues, highways, <br />canals, ditches or flumes existed prior to such construction, <br />operation or maintenance. Grantee agrees to provide adequate <br />safeguards to afford security to life and property during <br />installation and maintenance of cables, with due regard <br />being given to other existing uses of such roads, streets, <br />alleys, avenues, highways, canals, ditches or flumes. Grantee <br />expressly agrees to the terms and conditions stated in Charter <br />Section 1304, incorporated herein and made a part hereof by <br />reference. <br /> <br />4.8 Trimming of Trees. In the conduct of its business, <br />subject to the prior ,written approval of Grantor's Director <br />of Public Works, Grantee shall be allowed to trim trees in <br />order to provide space for its facilities. Such tree trimming <br />shall be done in compliance with applicable ordinances and <br />in a safe and efficient manner with due regard for the health <br />of the trees involved. Grantee shall exercise diligence to <br />assure that trees are trimmed as little as possible and <br />follow practices designed to cause the minimum amount of <br />trauma to the trees being trimmed. All refuse created by <br />tree trimming will be removed and disposed of by Grantee in <br />an acceptable manner. <br /> <br />4.9 <br /> <br />System Interconnection. <br /> <br />(a) No later than ninety (90) days after the time <br />of completion of construction of the Santa Ana system, inter- <br />connection will be activated with Grantee systems in Fullerton <br /> <br />-14- <br />
The URL can be used to link to this page
Your browser does not support the video tag.