Laserfiche WebLink
<br />(a) Grantee agrees that interconnection will be acti- <br />vated with at least one channel each way with all other <br />Grantee systems built in Orange County, including, but not <br />limited to, the cities of Fullerton, Newport Beach, Seal <br />Beach and Buena Park, no later than January 1, 1987. <br /> <br />(b) No later than January 1, 1987, Grantee will enter <br />negotiations with non-Group W systems contiguous to Santa <br />Ana to interconnect with said systems with at least one <br />channel each way between said systems and the Santa Ana <br />system. Grantee shall either activate such interconnection <br />no later than July 1, 1987, or report to the Grantor the <br />status of negotiations and allow Grantor to engage in such <br />negotiations. Group W Cable, Inc., will be prepared to <br />agree to pay up to 50 percent (50%) of the cost of said <br />interconnections. Nothing included herein shall be inter- <br />preted to mandate interconnection with another system un- <br />less the other system's interconnection equipment is equal <br />in quality to the counterpart equipment in the Santa Ana <br /> <br />system. <br /> <br />(c) Grantee agrees to activation of two-way intercon- <br />nection between the City of Santa Ana and Cypress Community <br />College, between the City of Santa Ana and Fullerton Commu- <br />nity College, between California State University, <br />Fullerton, and the City of Santa Ana, between Santa Ana <br />College and Cypress Community College, and between the two <br />campuses of Santa Ana College, no later than January 1, <br />1987. <br /> <br />(d) Grantee shall make available up to $45,000 annually <br />to Grantor to enable Grantor to lease satellite uplink <br />facilities and purchase transponder time. When Grantor <br />desires to lease satellite uplink facilities or to purchase <br />transponder time for a non-live cablecast, Grantor shall <br />give Grantee 48 hours written notice thereof. Grantor <br /> <br />-7- <br />