My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - SANTIAGO STREET LOFTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
04/19/2004
>
75C - SANTIAGO STREET LOFTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:02:51 PM
Creation date
4/20/2004 5:03:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75C
Date
4/19/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />MITIGATION MONITORING AND REPORTING PROGRAM <br /> <br />SANTIAGO STREET LOFTS <br />SANTA ANA, CA <br /> <br /> Completion <br /> TIming of Method of Responsibility for <br />MMNo. MItigation Measure Verification Verification Monitoring Date Initials <br /> Compliance <br /> Air Quality <br /> The contractor shall limit heavy truck During On-Site Construction Site <br />111-1 site deliveries to no more than 25 Grading and Monitoring Manager <br /> loads oer day. Construction <br /> The construction contractor shall log <br /> all heavy-truck deliveries and submit <br /> the log monthly to the City.s During On-Site Construction Site <br />111-2 Environmental Coordinator to ensure Grading and Monitoring Manager <br /> that construction operations are Construction <br /> limited to no more than 25 truck <br /> deliveries oer dav. <br /> All primers shall contain less than 0.85 Prior to <br />111-3 pound per gallon (102 gram/liter) Issuance of Plan Check Building and <br />VOC. Building Planning Agency <br /> Permit <br /> All top coats shall contain less than Prior to <br />111-4 0.07 pound per gallon (8 grams/liter) Issuance of Plan Check Building and <br />VOC. Building Planning Agency <br /> Permit <br /> All heavy equipment shall be tuned-up <br /> to manufacturer's specifications (Dr <br /> better). The construction contractor During On-Site Construction Site <br />111-5 shall provide the City of Santa Ana Grading and Monitoring Manager <br /> Environmental Coordinator with Construction <br /> service records of all diesel-powered <br /> heaweeui ment. <br /> To ensure construction of the <br /> structures does not coincide with <br /> paving or painting of structures, the <br /> contractor shall submit to the City of <br /> Santa Ana Environmental Coordinator Prior to <br />111-6 a Construction Phasing Plan that Issuance of Plan Check Environmental <br />identifies when the different Grading Coordinator <br /> construction activities for the project Permit <br /> would start and cease. A <br /> Construction Phasing Plan shall be <br /> ~~~~~~1the ~;ole:'ch development <br /> Grading plans for the proposed project <br /> shall reflect the following notes: <br /> All material excavated or graded <br /> shall ba sufficiently watered to <br /> prevent excessive amounts of <br /> dust. Watering with complete <br /> coverage shall occur at least Prior 10 <br />111-7 twice daily, once In the late Issuance of Plan Check Building and <br /> moming and once after work Is Grading Planning Agency <br /> done for the day. Permit <br /> All clearing and earthwork <br /> activities shall cease during <br /> periods of high winds (i.e., winds <br /> greater than 25 mph averaged <br /> over one hour) or during State 1 <br /> or StaDe 2 smoo e isodes. <br /> <br />EXHIBIT 12 <br /> <br />Mitigation Monitoring and Reporting Program <br />Santiago Street Lol/s <br />Santa Ana, CA <br />Page 1 <br /> <br />75C-47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.