My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - SANTIAGO STREET LOFTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
04/19/2004
>
75C - SANTIAGO STREET LOFTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:02:51 PM
Creation date
4/20/2004 5:03:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75C
Date
4/19/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Completion <br /> TIming of Method of Responsibility for <br />MMNo. Mitigation Messure Verification Verification Monitoring Date Inltlsls <br /> Compliance <br /> Streets surrounding the project <br /> site shall be cleaned at the end <br /> of each day of construction. <br /> All material transported off-site <br /> shall either be sufficiently <br /> watered or securely covered to <br /> prevent excessive amounts of <br /> dust. <br /> Cultural Resources <br /> Grading plans for the proposed project <br /> shall reflect the following note: 'In the <br /> event unknown cultural resources are Prior to <br /> encountered during excavation and Issuance of Building and <br />V.1 grading operations, all grading and Grading Plan Check Planning Agency <br /> excavation shall cease in the area of <br /> the find and the City's Environmental Permit <br /> Coordinator shail be notified for <br /> annronriate action." <br /> Geology snd Soils <br /> All earthwork and grading shall be Prior to <br /> performed in accordance with all Issuance of Building and <br />VI-1 applicable requirements of CALOSHA Grading Plan Check Pianning Agency <br /> and applicable specifications of the <br /> Santa Ana Gradino Code. Permit <br /> All earthwork recommendations <br /> specified in the Preliminary <br /> Geotechnical Investigation prepared <br /> by Albus-Keefe & Associates, Inc., Prior to <br /> (July 23, 2003), including those for Issuance of Building and <br />Vi-2 site clearance, ground preparation, Grading Plan Check Planning Agency <br /> temporary excavations, pia cement of Permit <br /> fill, and potentiai importation of soil <br /> materials to the site, shall be <br /> incorporated into the design of the <br /> nronosed nroiect. <br /> The site and structures shall be <br /> designed In accordance with the <br /> following values prescribed in the <br /> 1997 Uniform Building Code, which <br /> include: <br /> Parameter <br /> Value <br /> Seismic Zone Factor, Z Prior to <br />VI-3 0.4 Issuance of Plan Check Building and <br /> Soil Profile Type, S Grading Planning Agency <br /> So Permit <br /> Near Source Factor, Na <br /> 1.0 <br /> Near Source Factor, Nv <br /> 1.0 <br /> Seismic Coefficient, Ca <br /> 0.44 <br /> Seismic Coefficient, CV <br /> 0.64 <br /> The project elements, including Prior to Building and <br />VI-4 :<;:;~~:iO~e~a".:'~¿'¡¡;ta~:~s w~~sd Issuance of Plan Check <br /> Grading Planning Agency <br /> <br />Mifigation Monitoring and Reporting Program <br />Sanüago Sfraet Lofls <br />Sanfa Ana, CA <br />Page 2 <br /> <br />75C-48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.