Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br /> Completion <br /> Timing of Method of Responsibility for <br />MMNo. Mitigation Measure Verification Verification Monitoring Date Initials <br /> Compliance <br /> fiatwor1<, and pavement, shali be Permit <br /> designed in accordance with the <br /> recommendations specified in the <br /> Preliminary Geotechnical Investigation <br /> ~~~~~s. I~t 'JU~~~~-~~~~~. & <br /> Hazards and Hazardous Materials <br /> Prior to the Issuance of demolition <br /> permils, an asbestos survey (i.e.. Prior to <br />VIi-1 inspection, identification, and Issuance of Plan Check Environmental <br />quantification) shali be prepared and Demoiition Coordinator <br /> submitted to the City of Santa Ana Permit <br /> Environmental Coordinator for review. <br /> SCAQMD notification to include <br /> project description, removal Prior to <br />VIi-2 procedures and time schedules issuance of Plan Check Environmental <br />(options provided in Rule), material Demolition Coordinator <br /> handling and clean-up, material Permit <br /> storane and disnosal methods. <br /> All handiing and removal of ACM must <br /> be performed by a certified Caiifomia <br /> State iicensed contractor that has <br /> been certified under the Caiifomia <br />VIi-3 Occupational Safety and Health During On-Site Demoiition <br />Administration (Cal OSHA). Ali Demoiitlon Monitoring Contractor <br /> workers must undergo 40 hours of <br /> hazardous materials handiing training <br /> and receive 8 hours of refresher <br /> traininn on a "eari" basis. <br /> When necessary, actual asbestos <br /> removal would be accompiished under <br /> a negative pressure environment with <br /> high efficiency particulate air (HEPA) <br />VII-4 filtration, through the use of a glove During On-Site Demoiition <br />bag or through adequate wetting. Demoiition Monitoring Contractor <br /> ACM is to be contained in certified <br /> leak-proof containers and the general <br /> pubiic is not aliowed access to the <br /> demolition-site. <br /> Hvdroloov and Water Qualilv <br /> The project developer shali prepare <br /> an NPDES post-construction storm <br /> water management plan In <br /> accordance with the Orange County <br /> Drainage Area Management Plan <br /> (DAMP) that Includes ali structural <br /> and non-structural "Best Management <br /> Practices" (BMPs) for the project. <br /> a, Submit and have approved a Prior to <br />VIIi.1 surface drainage/utility plan that Issuance of Plan Check Building and <br /> includes all structure aMPs (refer Grading Planning Agency <br /> to DAMP). Permit <br /> b. Provide two copies of the 'Water <br /> Quality Management Plan" <br /> (WQMP) that includes a <br /> description of all appiicable <br /> structural and non-structurai <br /> ~~~~e~~t",i~~r apply to the <br /> <br />Mitigation Moniforing and Reporting Program <br />Santiago Street Lol/s <br />Santa Ana, CA <br />Paga3 <br /> <br />75C-49 <br />