Laserfiche WebLink
<br />B. Require or result in the construction of new water or <br />wastewater treatment facilities or expansion of existing <br />facilities, the construction of which could cause <br />significant environmental effects? <br /> <br />E. Result in the deter.mination by the wastewater treatment <br />provider, which serves or may serve the project that it <br />has adequate capacity to serve the project's projected <br />demand in addition to the providers existing commitments. <br /> <br />Less Than Significant Impact <br /> <br />The City of Santa Ana and/or the Orange County Sanitation <br />District would provide wastewater service to the project <br />site. The treatment of wastewater would be provided at <br />Reclamation Plant 1 in the City of Fountain Valley. The <br />proposed project would be required to provide appropriate <br />sewer connection fees. The proposed project would not <br />significantly increase the demand for additional wastewater <br />facilities. <br /> <br />c. <br /> <br />Require or result in the construction of new storm <br />water drainage facilities or expansion of existing <br />facilities, the construction of which could cause <br />significant effects. <br /> <br />Less Than Significant Impact <br /> <br />The project site is situated within an area that is <br />currently improved with drainage facilities. Implementation <br />of the proposed project would not significantly increase <br />the amount of surface water runoff generated from the <br />project site. Implementation of the proposed project would <br />not require the construction of new drainage facilities <br />that would impact the environment. <br /> <br />D. <br /> <br />Are sufficient water supplies available to serve the <br />project from existing entitlements and resources or <br />are new or expanded entitlements needed? <br /> <br />Less Than Significant Impact <br /> <br />The proposed project would not significantly increase the <br />demand for water service over current levels water demand <br />within the project area. The proposed project is consistent <br />with the City's Urban Water Management Plan. Through the <br /> <br />21 <br /> <br />3f~~4ð <br />