My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HARPER & ASSOCIATES 1 - 2004
Clerk
>
Contracts / Agreements
>
H
>
HARPER & ASSOCIATES 1 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:55:11 PM
Creation date
6/9/2004 3:31:59 PM
Metadata
Fields
Template:
Contracts
Company Name
Harper & Associates Engineering Inc.
Contract #
A-2004-074
Agency
Public Works
Council Approval Date
4/19/2004
Expiration Date
12/31/2005
Insurance Exp Date
6/24/2008
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal Exterior Paint and Structural Retrofit <br />City of Santa Ana -Two Reservoirs <br />February 23, 2004 <br />to bring reservoir in line with a 60 year experience on performance of <br />reservoirs during earthquakes for specific zones. <br />7. Three copies of all written reports will be submitted. <br />8. Meet with City to discuss results and recommendations to determine the scope <br />of work for preparation of the technical specifications and drawings. <br />9. Seismic recommendation will include a general site risk assessment. <br />a. A geotechnical study is not included as part of this Proposal. If a <br />geotechnical study is required, this work should be accomplished by a <br />reputable geotechnical consultant. At a minimum, the following should <br />be addressed in any geotechnical study: <br />1) The geologic setting of the site <br />2) Potential geologic hazards, including, faulting and seismic <br />analysis to estimate expected ground motions with associated <br />single-degree-of-freedom horizontal acceleration or velocity <br />response spectra for 0.5, 2.0, 5.0 and 10.0 percent levels of <br />structural damping. <br />3) Site coefficient (per UBC standards) <br />4) General subsurface conditions <br />5) General extent of existing overburden soils <br />6) Stability of existing slopes <br />7) Potential for liquefaction <br />8) Evaluation of bearing capacities of the existing reservoir <br />foundations and development ofrecommendations for additional <br />foundation support for both downward and upward loads. <br />9) Corrosivity evaluation of soil samples (This was possibly <br />accomplished during original or subsequent project which <br />involved subgrade piping, etc.) <br />D. SCOPE OF WORK -EXTERIOR CORROSION EVALUATION <br />1. Accomplish review of any records relevant to the project and accomplish field <br />Harper & Associates Engineering, Inc. <br />proposals~.SantaAna-2tks 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.