My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HARPER & ASSOCIATES 1 - 2004
Clerk
>
Contracts / Agreements
>
H
>
HARPER & ASSOCIATES 1 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:55:11 PM
Creation date
6/9/2004 3:31:59 PM
Metadata
Fields
Template:
Contracts
Company Name
Harper & Associates Engineering Inc.
Contract #
A-2004-074
Agency
Public Works
Council Approval Date
4/19/2004
Expiration Date
12/31/2005
Insurance Exp Date
6/24/2008
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal Exterior Paint and Structwal Retrofit <br />City of Santa Ana -Two Reservoirs <br />February 23, 2004 <br />contractor's questions and clarifications of project and mail to all <br />attendees and become part of the contract documentation. HAE has <br />found that this practice has minimized the occurrence of addenda or <br />R.F.I.'s <br />2. Provide telephone liaison with potential bidders as regards all matters <br />concerning bidding of the project and prepazation of addenda as required to <br />document design changes or clarifications. <br />3. Assist City in telephone evaluation ofbids received and make recommendations <br />for award or rejection. <br />4. Assist City in conducting Pre-Construction Conference to enable all relevant <br />parties to comprehend scope of project, implementation of specification and <br />City requirements. <br />a. Prepare minutes ofPre-Construction Conference covering all aspects of <br />contractor's questions and clarifications of project and present to all <br />parties. <br />5. Assist City in review and approval of Contractor submittals and project <br />procedures for project. Rejected submittals would be supplemented with an <br />explanation of the reason for rejection and requirements for re-submittal. <br />6. Respond to Requests for Information and provide clarification of the plans and <br />specifications during construction process. <br />7. Prepare change orders as needed. HAE has a very low occurrence of change <br />orders on our projects because of our detailed technical specifications and plans. <br />The modifications communicated by change order would be fully documented <br />with written descriptions of the work required. <br />8. Review all contractor invoices, inspection reports, inspector estimates ofpercent <br />completion and make recommendations tothe District forpayment ofcontractor <br />as appropriate. <br />9. Provide periodic site inspection during structural retrofit. It is anticipated three <br />visits per reservoir. <br />10. Consultant recommends the City obtain full time quality control inspection <br />during the exterior painting and interior coating repair. This cost is not included <br />in this proposal. <br />G. SCOPE OF WORK -STRUCTURAL INSPECTION <br />Harper & Associates Engineering, Inc. <br />proposals\SantaAna-2tks 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.