My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - 1935 E. SEVENTEENTH ST.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
06/21/2004
>
75B - 1935 E. SEVENTEENTH ST.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:02:22 PM
Creation date
7/2/2004 2:50:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
7/21/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />surfaces tributary to the street. Since nuisance flows <br />usually originates in the street, they commonly contain <br />many common pollutants found in streets such as oil/grease, <br />metals and sediment. Because the proposed project involves <br />an auto servicing/auto repair use there is a higher <br />potential for water quality impacts associated with <br />substances such as oil and grease. To minimize the <br />potential for degraded surface water impacts generated from <br />the proposed project, the all entrances of all service bays <br />perimeter of the garage area shall have a raised curb to <br />retain surface water runoff on the project site. <br />Additionally, during construction operations Best <br />Management Practices would be employed to minimize <br />potential construction-related water quality impacts. <br /> <br />Mitigation Measure <br /> <br />B. <br /> <br />Q. <br /> <br />. <br /> <br />Building plans for the proposed proj ect shall reflect <br />a raised curb around the perimeter of the garage area <br />to retain surface water runoff onsite, <br /> <br />. <br /> <br />The service area shall be constructed to drain <br />underground clarifier/sump/tank equipped with a <br />off valve that can stop further drainage of <br />water or spilled material into the street and <br />drain system. <br /> <br />to an <br />shut- <br />storm <br />storm <br /> <br />. <br /> <br />Construction plans for the proposed project shall <br />reflect that Best Management Practices would be <br />employed for all exterior construction activities. <br /> <br />Substantially deplete groundwater supplies or <br />interfere substantially with groundwater recharge such <br />that there would be a net deficit in aquifer volume or <br />a lowering of the local groundwater table level. <br /> <br />Have a potentially significant adverse impact on <br />groundwater quality? <br /> <br />No Impact <br /> <br />Construction operations for the proposed project would not <br />require de-watering activities. The long-term operation of <br />the proposed project would not have any impact on <br />groundwater supplies. Additionally, the proposed project <br />would not interfere with ground water recharge because the <br /> <br />13 <br /> <br />75R'2~~8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.